Commissioning the System. Use Service form 1A Proof of performance Speeds up Tech support Reduces recalls Commissioning.

Similar presentations


Presentation on theme: "Commissioning the System. Use Service form 1A Proof of performance Speeds up Tech support Reduces recalls Commissioning."— Presentation transcript:

1 Commissioning the System

2 Use Service form 1A Proof of performance Speeds up Tech support Reduces recalls Commissioning

3 Balancing Orifices Works with all plenums 15, 35, 50% Easy to re-balance system

4 Airflow Checks U tube or Slope Gauge – best way Delta T in cooling 25-28 deg. Electric Heat Delta T check Motor Amperage

5 Static Pressure Affects on Fan Performance

6 Electric Heat Airflow Convert KW to BTU (3413 X KW = BTU) DeRate for 208 (.8) Cfm x’s1.08 x’s Temp. Diff. = BTU Compare to unit data

7 Winterizing Cooling Only Units Winter supply shut-offs Seal the return Winterize condensate Shut off breaker