Week 13 Deliverables Team Highlander
2
Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward
3
Working shots
4
Working Shots
6
Reasons why old design is better Less footprint area Less parts More aesthetically pleasing Handle rotation in constrained by frame; less complex No drilling through frame required Able to collapse
7
To do list for next week Contact REAR (Rehabilitation Engineering and Applied Research lab) about design Machine the pieces needed for welding (water jet); this includes all the pivot joints Begin machining the stopper legs using wood Finalize CAD drawings
Similar presentations