1 Week 13 Deliverables Team Highlander

2 Modifications from last Mock-Up Lever assembly is offset from walker Ski assembly is now solid Levers swing upward

3 Working shots

4 Working Shots

5

6 Reasons why old design is better Less footprint area Less parts More aesthetically pleasing Handle rotation in constrained by frame; less complex No drilling through frame required Able to collapse

7 To do list for next week Contact REAR (Rehabilitation Engineering and Applied Research lab) about design Machine the pieces needed for welding (water jet); this includes all the pivot joints Begin machining the stopper legs using wood Finalize CAD drawings