Download presentation
Presentation is loading. Please wait.
Published byWinfred Bradley Modified over 9 years ago
1
WOODLAWN PUBLIC LIBRARY NEWS & UPDATES April 6, 2009
2
Study Purpose To evaluate service constraints associated with the existing Woodlawn branch To consult with library users and the community concerning current and future needs To recommend a preferred option for an expansion or replacement library of 12,000 sq. ft. To evaluate potential sites and recommend a preferred site To develop a functional space program To establish preliminary capital costs and implementation plan
3
Study Process
4
Library Design / Development Contemporary Libraries Are: Focal Points in the Community Accessible, Comfortable, Welcoming High Profile, Attractive, Visible Multi-Service Providers Centres for Technology and Innovation Part of an Active Service Hub Focused on Customer Service Efficient to Operate, Convenient to Use
5
Study Considerations The Best Location to Serve Current and Future Users Population Growth/Changes in Communities Served by the Woodlawn Library Available Locations and Possible Development Partners Changing Library Needs and Interests Changing Expectations of Users
6
Design Principles Operationally Efficient Design Designed to Maximize User Convenience, Flexibility and Multiple Uses Designed for the Seamless Integration of Technology Designed as an Accessible, Attractive and Welcoming Community Hub Designed for Sustainability
7
Shortlisted Locations Initial Shortlist (Summer ‘08) Woodlawn Mall Penhorn Mall Additional Site (Fall ‘08 – Previously Unavailable) Empire Theatre
8
Comparative Site Evaluation Criteria Process to rank remaining sites Criteria –Access (Weight = Medium, 2) –Visibility (Weight = Medium, 2) –Compatible Use (Weight = Low, 1) –Centrality (Weight = High, 3) –Major Partnership Potential (Weight = Low, 1) –Distance from Other Branches (Weight = High, 3) –Complementary Use (Weight = High, 3) Scoring –3,2,1,0 (3 = fulfils the criteria, 0 = not at all)
9
What We’ve Been Up To Detailed examination of short-listed sites Negotiations with landlords Architectural / Mechanical / Electrical Plans developed Notification to staff and landlord
10
Comparative Evaluation Results Access Weight = 2 Visibility Weight = 2 Compatible Use Weight = 1 Centrality Weight = 3 Partner Weight = 1 Distance from Other Branches Weight = 3 Comple- mentary Uses Weight = 3 Score Empire Theatre 3636 2424 3333 2626 0000 2626 3939 15 34 Penhorn Mall 3636 3636 3333 1313 1111 1313 3939 15 31 Woodlawn Mall Option 2 2424 2424 2222 2626 0000 2626 3939 13 31
11
Where We’re Going Existing Woodlawn Library Empire Theatre
12
Where We’re Going
14
Features for the New Library 17,700 square foot space for the Library; 6,000 square foot space for Collection Management High quality stand-alone building 2 self-check out machines Defined areas for Children, Teens and Adults Large program room and 100-seat theatre Seating and study areas Indoor and outdoor book returns Free public parking; pedestrian and bus access Larger materials collection Computer Area
15
Next Steps Final lease negotiation Approval by the Halifax Regional Library Board and Municipal Council Interior design and layout Packing and moving
16
Time Line May through September: Construction and renovations October – Library installation and preparations for opening November – Move in!
17
Thank You
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.