1 Status of NA62 straw electronics Webs Covers Services Readout

2 Webs Production approaching the end Few problems with cut lines on flexible part Discovered with noise_scan program when mounted on the detector Special test bench for this problem was discussed at the beginning but deemed not needed – Probably not justified for few cases Current test bench proved to be very efficient to discover majority of the problems

3 COVER Full production arrived delayed and damaged – FedEx subcontracted the delivery to CERN – Test all boards ASAP to know the yield and possible problems – 20 left to test – 1 damaged mechanically – 10 did not pass the test

4 COVER Keep covers in place when installed on the detector – 2 modules completely installed – Tested with final LV patch panels – Few bad straw wires and web connections discovered during tests Remote programming – Firmware version 10 bugs for remote programming – Firmware version 11 Remote pgm now works Fixed bug in multi-edge bit Improved timing for DAC read-back

5 SERVICES Patch panels and on- detector cabling (Johan) – Dense but feasible – LV and HV cover cables with different lengths – All LV and HV cables ordered with timed delivery – RJ45 needs careful planning How many different lengths? Storage behind rack ~1 meter Wait for chamber installed in the pit? UK company ready to produce batches of different lengths

6 SERVICES Patch panels LV and HV – HV ordered at CERN Modification with copper GND plate instead od aluminium – LV tested completely by Johan DCS control in advanced state Still open – External temperature sensors – Humidity measurement ? – LV production tight Organized by TE-MPE group Fast PCB production Components for assembly prepared Total time ~6 weeks ½ March at CERN Johan to organize the test

7 SERVICES MPOD ordered – … but order lost – Delivered to ELCOTRON – Missing in Wiener – End of January not possible – Now end of February – HV modules new production Not on stock Will deliver 8-channel HV modules Swap with final when delivered As soon as we receive our MPOD – We have to return mini-MPOD which we have used till now – Test power supply of 1 module/2 views (full chamber?) Order the rest 3 MPODs, eventually 1 spare

8 SRB 2 FPGAs ready for schematics – Event manager – Frontend interface – Work is now focusing on vme and trigger Changes in connectivity and data flow – Input FPGA FESRB Added data/cmd direct links to vme_bm – For control and cover tests – Use of event_mgr unpractical – Delay of every cover clock line (16 lines) must be adjustable Trying 2 solutions – Use FPGA feature – Specialized clock generation chips with 8 outputs

9 SRB – components TTC LEMO L0 OUT COVERS TTCRx COVER CONTROL, DATA, SYNCH EVENT PROCESSOR 2(4)GB DDR3 DATA TO PC FARM TIME REMAP L0 PROCESSOR VME INTF ON-LINE MONITOR L0 LOOK_UP TABLE WORK

10 SRB – data flow 16x2x320Mbit/s ~10Gbit/s 2.5 Gbit/s 2x Gbit ethernet VME 1.6 Gbit/s

11 SRB Schematics + PCB design – Feb-> March foreseen – Possible delay of 2 weeks Prototype April/May