European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE and the NECD review Stefan Jacobi European Commission, DG Environment, unit C1 “Clean Air and Transport”
2
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels Review of the NECD l Article 9; Reports by the Commission m 2004 / 2008, to EP and Council, on progress on the implementation of the ceilings and on the extent to which IEO’s are likely to be met by 2010 and LTO could be met by 2020 m long list of specific items to be considered (15 paragraphs!) m 2012 report on compliance with the Directive l Article 10; Review clause m “...carry out a review of the Directive in preparation for each report” (referred to in Article 9)
3
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels The Review clause l Article 10 m “...reports will be, if appropriate, accompanied by proposals for: - modifications to the national ceilings... and/or for modifications of those IEO’s - possible further emission reductions... - measures to ensure compliance with the ceilings”
4
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels Additional reports l Article 12 m...on the extent to which emissions from international maritime traffic contribute to acidification, eutrophication and the formation of ground-level ozone within the Communities m...on the extent to which emissions from aircraft beyond the landing and take off cycle contribute... l Both reports have been prepared by the Commission and are published on DG Environment’s webpage
5
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels Adjusted timing The NECD review will be linked with the Thematic Strategy on Air Pollution !
6
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels CAFE schematic timeline Thematic Strategy Finalisation of RAINS model development Technical inputs of abatement potential and costs Consultations with MS qnd industry Publish CAFE Baseline CAFE Baseline ready & agreed Development of TREMOVE transport model Development CBA framework Model runs of policy packages Definition of policy packages Advice on health and ecosystems effects Assessing policies qualitatively and quantitatively Drafting Integrated policy advice and Thematic Strategy 200420032005 Data on NEC, AQ and own studies Input from conferences WHO summary report Revised NEC 2006 Accompanying legislation / measures
7
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels Preparing NEC review/revision l l November 2004 – deadline for MS to submit revised energy baselines for NEC revision, new information on technologies l l February 2005 – updating RAINS for the NEC review l l March to August 2005 – IIASA consultations with MS l l November 2005 - final stakeholder consultations on input. l l January 2006 –RAINS operational for NEC revision l l June 2006 – Commission proposal of revised NEC directive, including CBA
8
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels Preparing NECD review l l Contract launched to seek support to prepare for the review report and additionals l l ENTEC to work on it m contract signed: 7 July 2004 m kick-off meeting: 8 July 2004 m duration: 8 months + + Details will be presented by Alistair Ritchie (ENTEC)
9
European Commission - DG Environment Workshop on P&P and NP, September 1-2, Brussels This is the end... Thank you for your attention !