Download presentation
Presentation is loading. Please wait.
Published byCharla Rodgers Modified over 9 years ago
1
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-5-1 FOSS 2 – 18 FOSS HILL DRIVE FLOORING REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS – TYPICAL ROOM MAJOR MAINTENANCE FY 16 First Floor: Typical carpet squares on bluestone
2
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-5-2 FOSS 2 – 18 FOSS HILL DRIVE FLOORING REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS – TYPICAL ROOM MAJOR MAINTENANCE FY 16 First Floor: Typical carpet squares on concrete
3
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE: 12/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT 06457 WESLEYAN U N I V E R S I T Y P-5-3 FOSS 2 – 18 FOSS HILL DRIVE FLOORING REPLACEMENT PROJECT SECTION 00020 - EXISTING CONDITION PHOTOS – TYPICAL ROOM MAJOR MAINTENANCE FY 16 Second Floor: Typical 9 x 9 ACM tiles to be abated. Floor preparation required.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.