Plaaning for Projects We’ve prepared a module estimate for
i) BNRGSK building at Block Hqrs of Rs.25 lakhs each. ii) BNRGSK for GP Hqrs of Rs.10 Lakhs each. iii) Farm Ponds iv) Field Bunding at DRDA,and circulated to all Blocks for adoption,which has helped us to maintain uniformity & speedy execution of projects.
3
Awareness Programme A) MGNREGA Rath was made with various display banners explaining all aspects of MGNREGA in local language and was moved to villages forecasting the awareness among people. B) MGNREGA Mela was conducted at Panchayat level where PRI members, SHG members ,Asha Karmi in addition to the villagers were invited.The problems & suggestion were discussed in the Mela. C) Maha Palli Sabha was also called from 16th to 22nd May-2010 for selection of projects by the Pallisabha.
4
Steps taken for Quick completion of projects
Small projects are taken up and steps taken for complete those in a single phase, like small village roads, Small Farm ponds etc. Villagers are encouraged for coming together and finish the work within the scheduled time for work.
5
success stories MGNREGS
6
SUCCESS STORIES-NANDAPUR
Name Of The Project : Ghat Cutting of Road from B.Rukba to Panasput Name of the Village / G.P : B.Rukba / Khemunduguda Eastimated Cost : Rs.3,00,000/- Scheme / Year : MGNREGS / Mandays Generated : 4750 Total length of Road : 1.20 KMs Works Executed : Ghat cutting in stony earth, Rs dry masonry guardwall, Rs dray packing cause ways. Date of Starting : Date of Completion :
7
Photo before the project
8
Photo while the project going on.
9
Photo while the project going on.
10
Photo after completion of the project.
11
Photo after completion of the project.
12
Success stories of Koraput Block
Name of the Work- Const.of D/W with F/C at Khagadora Est.Cost Lakhs Scheme MGNRGA Village Khagadora G.P Dumuripadar Date of Starting /02/2009 Date of Completion- 17/09/2009 Total Length Masonary- 352 Meter Earthen Meter Description- It reaches to area of 17.5 Acres which has uplifted the living status of tribal.
13
Photographs Before Execution
14
Photographs During Execution
15
Photographs after Execution
16
Success stories of Koraput Block
Name of Work- Const.of road from Girliput to Badapadar Est.cost lakhs Scheme MGNREGS Gp KENDAR Total Mandays Wage component Lakhs Description- The road connects the villages Kusumguda, Bondakatra, Mastiguda and Bilaput. Earlier tribals are to travel 18 kms to reach block Hqr.
17
Photographs Before Execution
18
Photographs During Execution
19
Visit of Hon'ble Secy-PR to the work site
20
Photographs after Execution
21
KOTPAD BEFORE AFTER Name of the Project - Construction of W.H.S. at batakuhudi Village- Batakuhudi Gram Panchayat - Dhamanahandi, Block - Kotpad Dist. - Koraput Scheme - NREGA, Year Esst. Cost - Rs 5.00 Lakhs The cross bond was constructed over the perennial nallah called sunakota nalla by which the water rises to the cultivable land and after completion of this project about 50acr land get irrigated which was previously a dry land.
22
KOTPAD BEFORE AFTER Name of the Project - Construction of new tank at Colony 7 Village - S.B.Nuagam Gram Panchayat- S.B.Nuagam, Block - Kotpad Dist. - Koraput Scheme - NREGA, Year Esst. Cost - Rs 5.00 Lakhs The tank at Colony 7 was the dmand for the people of S.B.Nuagam village since long and the tank was excavated out of NREGA and no of mandays generated out of this project. 25 acr cultivable land get irrigated by this tank.
23
KUNDRA PROJECT PROFILE Name of the Work- Const.of Tank at Kaudiaguda
Name of the Scheme- NREGS(O) Estimated Cost- Rs.5.00 Lakhs Unskilled labourers- Provide employment to 4452 mandays Remarks- After this project the villagers of Kaudiaguda are mostly benefited During requirement of irrigation facilities around 22 Acres of agriculture field has been provided irrigation facilities . Around 28 numbers of ST households and 18 numbers of SC household are benefited after completion of this project. KUNDRA
24
KUNDRA PROJECT PROFILE
1. Name of the Work- Const.of farm pond of Sri.Jadu Kendu Hatoguda of Lima Name of the Scheme- NREGS(O) Estimated Cost- Rs.0.35 Lakhs Unskilled labourers- Provide employment to 500 man days Remarks- After this project the beneficiary Jadu Kundu of Hatoguda village of Lima GP is highly benefited during his vegetable cultivation of around 2 Acres throughout the year.His economic status has been increased consturcion of farm pond through NREGS scheme and he is highly appreciate to get the benefit through scheme. The unskilled labourers are Mostly Benefited during the Execution of the Work.
25
KUNDRA PROJECT PROFILE Name of the Work- Const.of CC road at Digapur
Name of the Scheme- NREGS(O) Estimated Cost- Rs.3.00 Lakhs Unskilled labourers- Provide employment to 1752 man days Remarks- After this project the villagers of Digapur ,Nuaguda, Nadialpallyare communicated with GP HQRs Digapur. Around 48 numbers of ST households and 22 numbers of SC household are benefited after completion of this project.
26
Name of the Work :- Const of Diversion weir with F/C at Maliput
Village of Pottangi Block. Name of the G.P :- Maliput Name of the Village :- Maliput. Estt. Cost: :- Rs3,00,000/- Scheme :- NREGS-09/10 (Water Bodies) Desc-A perinial Source emerging from Purunapadar village is crossing the NH-43 under a culvert where the water was bonded by an earthen cofferdam by villagers for irrigation purpose . The cofferdam was washed away by rains in every year. As per the persistence demand of farmers a concrete permanent diversion weir was to be constructed along the nallah, which will irrigated more aycut area like hectares . POTTANGI
27
Training Cum Production Center- Boipariguda
SGSY-Infrastructure of Cost Lakhs
28
THANK YOU