Download presentation
Presentation is loading. Please wait.
Published byDennis Houston Modified over 9 years ago
1
OLSC PLM Workgroup1 DOORS input for OSLC Storyboard V0.1 Gray Bachelor
2
OLSC PLM Workgroup2 Aims and objective To show how real ALM tools support and represent PLM process and related information To show how DOORS 9.3 represents the OSLC PLM Reference Model through the selected scenario of a Systems Engineer responds to change in Requirements
3
OLSC PLM Workgroup3 Purpose of this document To summarise the flow of changes to the requirements that DOORS needs to represent
4
OLSC PLM Workgroup4 Summary of the key business entities & their relationships CR Req Implem System or product context Pre-condition (Before Controlled config Is based upon or applies to* Post-condition (After CR System or product context Is implemented by Req Implem Controlled config System or product context Req Implem Controlled config * Assuming basic triaging has been done prior to the start of the scenario At some context version V’ At some new context version V’’ Updated to achieve the CR
5
OLSC PLM Workgroup5 Overall view of the scenario and naming Story 1 1 st set of changes to requirements Steps 0.0 to 0.4 Implement the 1 st set of changes Steps 1.0 to 1.X Story 2 2nd set of changes to requirements Steps 2.0 to 2.X Implement the 2 nd set of changes Steps 3.0 to 3.X In the kitchen ready
6
OLSC PLM Workgroup6 Summary of the Scenario flow from a tools perspective – Story 1 0.0 to 0.4 We aim to show the tool status at end phase in the flow 0.0 0.2a 0.2b 0.3 0.4
7
OLSC PLM Workgroup7 Story 1 Requirements changes to be shown as DOORS baselines through the scenario RequirementContext fromTo contextNotes Starting pointAll 3 exist-Pre condition 0.0 REQ-020181A No issatisfiedby B No issatisfiedby Post of Step 0.2a REQ-020144A Issatisfiedby link to AMG60104/001 B No issatisfiedby Post of Step 0.2a Text changes too Post 02b AKY251614A Association with Product AMG 54556/001 and Implementation AMG60112/001 B No issatisfiedby Post Step 0.3 REQ-020144B No issatisfiedby B Issatisfiedby link to AMG60104/002 Post Step 1.1 AKY251614B No issatisfiedby B Issatisfiedby link to AMG60112/002 Post Step 1.2 AKY251614B Issatisfiedby link to AMG60112/001 B Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002 Post Step 1.3
8
OLSC PLM Workgroup8 Story 2 New and changed requirements to be shown as DOORS baselines through the scenario RequirementContext fromTo contextNotes Starting pointAll 3 exist-Pre condition based on 1.3 REQ-020186-A No issatisfiedby Post of Step 2.2 REQ-020187-A No issatisfiedby Post of Step 2.2 REQ-020188-A No issatisfiedby Post of Step 2.2 REQ-20144B Issatisfiedby link to AMG60104/002C No issatisfiedby Post of Step 2.3 REQ-20181B No issatisfiedby C No issatisfiedby Post of Step 2.5 AKY251614B Association with Product AMG 54556/002 and Issatisfiedby link to AMG60112/002 C No issatisfiedby Post Step 2.7 AKY251614C No issatisfiedby C iscomposedof REQ-020186 Post Step 2.7
9
OLSC PLM Workgroup9 Story 2 New and changed requirements to be shown as DOORS baselines through the scenario RequirementContext fromTo contextNotes REQ-20144C No issatisfiedby C Issatisfiedby link to AMG60104/003 ??? Post 3.2 REQ-020187C No issatisfiedby A Issatisfiedby link to ??? Post 3.2 REQ-020188C No issatisfiedby A Issatisfiedby link to ??? Post 3.2 AKY251614C Issatisfiedby link to ??? C Issatisfiedby link to ??? And Association with Product AMG 54556/003 Post 3.3
10
OLSC PLM Workgroup10 Links Mike’s page http://open- services.net/bin/view/Main/PlmScenariosGm http://open- services.net/bin/view/Main/PlmScenariosGm Files used at 14/4 HSUVExample_Story_1.pptx: Story 1 (Requirements Change) Step by Step Description with Pictures (updated to match revisions of above) # HSUVExample_Story_2.pptx (WORK IN PROCESS) Slides describing the Story 2 sequence, which adds two variants of the emissions requirement
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.