Environmental Technology ChimH409 (2-0-1) Michel Verbanck mikeverb@ulb.ac.be 2012 Universite Libre de Bruxelles Welcome @ Bruface Dept Water Pollution Control
2
Course structure Part 1. Introduction (incl. generic methods) Part 2. Air pollution control engineering Part 3. Water & wastewater treatment Part 4. Solid and hazardous wastes
3
Part 3. Water & wastewater treatment
6
Total Solids ( 400 –1200 mg/L) often a function of parasitic clearwater infiltration into the sewers Inorganic (ash) 50% Organic (volatile) 50% Dissolved inorg. 35% Suspended (>1 µm) 45% (15% inorg) (30% org) Dissolved organic 20% Non-settleable inorganic 40% Settleable (“>10µm”) 25% (10% inorg ; (15% organic) Non-settleable organic 35% Typical composition of untreated domestic wastewater
7
Archimedes screws for initial wastewater pumping
8
bar screen separation
10
Grit and grease removal
11
counter-current washing and extraction of the grits
12
Typical steps in municipal wastewater treatment
13
DECANTATION Gravity – Archimedes buoyancy Terminal settling velocity v s
14
DECANTATION Terminal settling velocity v s We define a = 1.096 b = 13.86 Gravity – Archimedes buoyancy
15
vsvs = v s d vsvs
19
Boycott effect
20
v s can now be reduced to
21
LAMELLA SETTLING TANKS: Shortening the settling distance Pipe bundles also used
23
Actiflo process (OTV - Krüger) coagulation, flocculation, settling assisted by 125µm microsand injection, lamellar gravity separation residence time lower than 15 min
24
Module for flow repartition (between dry-weather and wet-weather treatment lines)
25
Parshall flume for flow-rate measurement (at the outlet of the plant)