Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1.

Similar presentations


Presentation on theme: "May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1."— Presentation transcript:

1 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1

2 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 2

3 Hall roof span is a simple span –Rock bolts provide the structural support –Drip Ceiling provides a dry and clean space. Walls and floor use rock bolts for structural support, concrete lined. May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 3

4 Simple rock massing Uninterrupted roof spans and wall supports. May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 4

5 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 5

6 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 6

7 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 7

8 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 8

9 9 Japan - Sample site Exp-hall Access tunnel

10 10 Japan - Sample site Enough space for detector solenoids

11 May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 11


Download ppt "May 2011 ILC - ILD ILD Workshop 2011 LAL, Paris 1."

Similar presentations


Ads by Google