Download presentation
Presentation is loading. Please wait.
Published byRandell Crawford Modified over 9 years ago
1
CHAMBER PRODUCTION AT CERN 904 RPC UPGRADE-MEETING, 08.JAN.2014 DONG-HYUN KIM ON BEHALF OF THE CERN-904 TEAM DEPARTMENT OF PHYSICS, SUNGKYUNKWAN UNIVERSITY, KOREA 1
2
Content 1. Status of 904 site 2. Data Analysis 3. Plan 2
3
1. Status of 904 site Visual test – 17 BO Gaps Made 3 HV-Connector Still waiting a Gas back New india-student coming 3
4
2. Data Analysis 4
5
ABCMerge 2. Data Analysis 5 For IDIso - μ+
6
ABCMerge 2. Data Analysis 6 For IDIso - μ+
7
ABCMerge 2. Data Analysis 7
8
ABCMerge 2. Data Analysis 8 For STA - μ+
9
ABCMerge 2. Data Analysis 9 For STA - μ+
10
ABCMerge 2. Data Analysis 10
11
ABCMerge 2. Data Analysis 11 For Tracking - μ+
12
ABCMerge 2. Data Analysis 12 For Tracking - μ+
13
ABCMerge 2. Data Analysis 13
14
3. Plan Calculate Trigger Muon Efficiency Leak test for the BO Gaps Dark-current test for the BO Gaps Make the HV-Connetor 14
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.