Download presentation
Presentation is loading. Please wait.
Published byElfrieda Goodwin Modified over 9 years ago
1
Determining the Feasibility of the Recovery of Woody Biomass Bob Rummer, US Forest Service Mark Engle, Four Corners Consulting
2
Feasibility Technical Technical –Performance –Meeting constraints Economic Economic –Market values of goods and services –Costs of operation Introduction
3
Determining Feasibility Contractors bidding on a project Contractors bidding on a project Grantors or investors Grantors or investors Wood purchasers Wood purchasers Resource managers Resource managers Policy makers Policy makers Introduction
4
Current Condition Desired Future Forest Operation How to treat Prescription What to treat Forest Products and Ecosystem Services Introduction
5
Outline Technical feasibility issues Needs and constraints Needs and constraints Biomass system technology Biomass system technology Performance estimation Performance estimation Economic feasibility issues Business planning Business planning Introduction
6
Prescription Piece size Piece size Species Species Volume per acre Volume per acre Acres per landing Acres per landing Residual spacing Residual spacing Utilization Utilization Terrain (slopes, riparian) Terrain (slopes, riparian) Additional work Additional work Needs and Constraints
7
Prescription Constraints Soil disturbance Soil disturbance Residual damage Residual damage Exclusions (arch sites, nesting) Exclusions (arch sites, nesting) Operating season Operating season Activity fuels Activity fuels Noise Noise Needs and Constraints
8
Example: WUI Work hours limited 700-1700 Work hours limited 700-1700 Road impacts (no steel grousers) Road impacts (no steel grousers) Unit size <5 ac Unit size <5 ac Landings limited Landings limited Terrain relatively flat Terrain relatively flat Control risk to public Control risk to public High visibility High visibility Needs and Constraints
9
Kyle Canyon, NV Needs and Constraints
10
Los Alamos, NM Needs and Constraints
11
Products and Markets Current wood users Current wood users –Products –Market size Merchandizing operations Merchandizing operations –Size –Processing or conversion Needs and Constraints
12
Generic Technical Solutions Functions Functions –Felling, skidding, processing, loading Systems Systems –Ground-based Whole tree or tree length Log length –Cable –Helicopter System Technology
13
Biomass Recovery Added component of multi-product harvesting Added component of multi-product harvesting Biomass harvesting smallwood Biomass harvesting smallwood Biomass harvesting brush/understory Biomass harvesting brush/understory Short-rotation woody crops Short-rotation woody crops System Technology
14
Multi-product harvest System Technology: Roadside 85% 15%
15
Clean chips + biomass 20% 80% System Technology: Roadside
16
Biomass Processing System Technology: Roadside
17
Mobile Conversion System Technology: Roadside
18
Recovering Residues Chipping/grinding with harvesting Chipping/grinding with harvesting Chipping/grinding separately Chipping/grinding separately Hauling residues Hauling residues Keep the chipper busy Keep the chipper busy Can get complex Can get complex Don’t haul slash very far Don’t haul slash very far System Technology: Roadside
19
Forwarding or skidding Payload = 1/3 solid wood System Technology: In-woods
20
Forwidder
21
Biomass Bundling System Technology: In-woods
22
In-woods biomass harvest System Technology: In-woods
23
In-woods residue collection Very sensitive to volume per acre Very sensitive to volume per acre Concentration by previous work Concentration by previous work Payload is critical Payload is critical Generally can’t pay for itself Generally can’t pay for itself System Technology: In-woods
24
1980—Nicholson Koch System Technology: Swath
25
Texas A&M Mesquite Photo: Texas A&M Univ System Technology: In-woods
26
Swath Harvesters Sensitive to volume per acre Sensitive to volume per acre Less sensitive to small piece size Less sensitive to small piece size Takes everything Takes everything Cleaning machines Cleaning machines Alternative to mastication Alternative to mastication How to move the chips? How to move the chips? System Technology: Swath
27
WT to chipper System Technology: Fuel Thinning
28
Photo: BLM, Alturas System Technology: Fuel Thinning
29
Fuel Thinning System Technology: Fuel Thinning
30
Biomass Thinning Low-value product Low-value product Generally facing smaller diameters Generally facing smaller diameters Many special treatments Many special treatments Tend to be lower system output Tend to be lower system output System Technology: Fuel Thinning
31
Put a number on Productivity Need to know output Need to know output Need to know time required Need to know time required Performance Estimation Productivity = output / time
32
If you have a system … Gross production estimate Gross production estimate –simple –Includes all effects, delays –Only applies to specific conditions Do your own time study Do your own time study –Small sample of only productive time –Measure things that affect time Performance Estimation
33
Example: skidding Key variable is distance Key variable is distance Performance Estimation
34
Get your data Performance Estimation
35
Summarize Results Watch skidding for a truckload Watch skidding for a truckload Total volume skidded/# turns Total volume skidded/# turns –Volume per turn Total time Total time Calculate the average skid distance Calculate the average skid distance Performance Estimation “Skidder got 20 tons per hour at an average skid distance of 300 ft”
36
Unknown Machine Look at spec sheets for payload Look at spec sheets for payload Estimate operational speeds Estimate operational speeds Performance Estimation “Feller-buncher can cut 2 trees/min that are 250 lbs each for a productivity of 15 tons per hour”
37
Be Careful How many productive hours can you get in a year? How many productive hours can you get in a year? Did you see all work tasks? Did you see all work tasks? What limited production? What limited production? Don’t overlook overhead Don’t overlook overhead Performance Estimation
38
Look at the Whole System System output is limited by slowest operation System output is limited by slowest operation Performance Estimation Felling $75/hr 20 tons/hr Skidding $75/hr 12 tons/hr Loading $50/hr 80 tons/hr
39
Technical Feasibility Meets required performance Meets required performance Estimate of production rate Estimate of production rate Some idea of how output is affected by key factors Some idea of how output is affected by key factors Performance Estimation Now the key question is, “Can you make money with it?”
40
Why is feasibility an issue? Constraints generally decrease options Constraints generally decrease options Constraints not treated as tradeoffs Constraints not treated as tradeoffs There are unsolvable problems There are unsolvable problems New product opportunities/requirements New product opportunities/requirements “There be monsters …” “There be monsters …” –Wide range of risks/unknowns
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.