Download presentation
Presentation is loading. Please wait.
Published byShon Long Modified over 9 years ago
1
October 7, 2015
3
Lorin Starr, Chair Scott Bergeron, Vice Chair Stuart Beckley, Secretary Bruce Bennett Carl Fiocchi Leon Markowski Jeff O’Brien Pat Patenaude
6
Berkshire Design Group, Northampton Site Feasibility LDS Consulting, Needham Market Study Condition Assessment of House by 120 Committee
7
Maintain the character of the street & neighborhood Provide sufficient number of units to create a project that is financially feasible
11
120 North Main Future Blue Heron Building Future Dimo’s Restaurant Town Hall
12
120 North Main Dimo’s Restaurant Blue Heron Building Town Hall
14
LOCATION Community Connectivity Near Town Center Library Store Restaurants Public Transportation
17
Smaller Footprints/ More Architectural Detail
20
Barn
24
New Barn Residence 120 North Main Street
25
The Barn at 120 North Main Existing Driveway
26
120 North Main Street Existing Driveway
27
120 North Main Street The Barn at 120 North Main
28
The Silo (Elevator) Barn with Windows Main Entrance Service Area
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.