Download presentation
Presentation is loading. Please wait.
Published byMarjorie Carroll Modified over 9 years ago
1
Engineering Department ENEN ENEN IT4070/EN/LHC Design, Supply, Installation, Testing and Commissioning of an HVAC Systems the for SR8 Facility Bidder’s conference – 28 th November 2014 Y. Body / EN-CV
2
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
3
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
4
Engineering Department ENEN ENEN INTRODUCTION: CERN
5
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
6
Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility
7
Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility
8
Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility R-401R-402 R-403
9
Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system
10
Engineering Department ENEN ENEN INTRODUCTION: SR8 Facility – Former ventilation system
11
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
12
Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression R-403 R-401 R-403 NEW VENTILATION SYSTEM R-402
13
Engineering Department ENEN ENEN Two AHUs: one in R-401 and one in R-403 R-402 Alcove used for decompression NEW VENTILATION SYSTEM
14
Engineering Department ENEN ENEN R-401, R-403 alcoves Air Handling Unit Sepcial shape part between AHU and mixing chamber including the air tight access door Return air grille (UQGN) Fresh air intake (UQCF) Fresh air damper (UVUM) Return air damper (UVUM) Pre-filtration (UFPZ) NEW VENTILATION SYSTEM
15
Engineering Department ENEN ENEN R-402 alcove Exhaust air grille (UQCF) Exhaust air grille (UQGA) Exhaust air dampers (UVUM) Opening closure NEW VENTILATION SYSTEM
16
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
17
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Items supplied by CERN CERN will provide the control software based on the I/O list and functional analysis provided by the Contractor
18
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Design criteria and conditions
19
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations
20
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Applicable Standards, Rules, Regulations Halogen forbiden Possible derogation for very small parts AHUs: total amount of halogeneted material to be indicated in the tender
21
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Responsibility for the Design
22
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation Including power and control cubicles schematics
23
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation
24
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Documentation
25
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Delivery schedule
26
Engineering Department ENEN ENEN TENDER DOCUMENTS: Technical Specification – Tests 1. I/O testing with basic PLC standard software suite (done by the Contractor) Power available in the cubicles and all equipment cabled to the PLCs Supplier able to charge the basic PLC configuration and test all I/Os from within the software 2. I/O testing with CERN software (done by CERN with presence of Contractor) Test report from phase one validated by CERN Setup of instrumentation is finished (scaling of analog probes, pressostats, …) All hardware responding to commands Contractor able to force all I/Os electrically 3. Functional testing with CERN software (done by CERN with presence of Contractor) All hardware and instrumentation operating according to specifications (failsafe positions on dampers, electrical equipment protections all working, etc) Ability to run the units and test regulation loops 4. Commissioning (done by CERN with the presence of Contractor) Installation able to work at the design envelope conditions (nominal flow and power, …)
27
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
28
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Panel of the AHUs
29
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Measuring section
30
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Electrical heaters
31
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 1 – Chilled water coils Copper pipe with a thickness of 0.89mm allowed Given the existing room dimensions, higher air velocity allowed (<3m/s)
32
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN
33
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 2 – Instrumentation
34
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation Annex 6: DQE PLAN
35
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 3 – Electricity
36
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
37
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 4 – Identification
38
Engineering Department ENEN ENEN INTRODUCTION CERN SR4 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
39
Engineering Department ENEN ENEN TENDER DOCUMENTS: Annex 5 – Tests and Inspection performed on Contractor’s Premises As per section 4.3.1 of the Technical Specification
40
Engineering Department ENEN ENEN INTRODUCTION CERN SR8 Facility NEW VENTILATION SYSTEM TENDER DOCUMENTS Technical Specification Annex 1: Technical Requirements for HVAC Annex 2: Technical Requirements for Instrumentation Annex 3: Technical Requirements for Electricity Annex 4: Technical Requirements for Identification Annex 5: Technical Requirements for Testing, Inspection and Commissioning an HVAC Installation PLAN
41
Engineering Department ENEN ENEN Thank you for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.