Download presentation
Published byAdela Horton Modified over 9 years ago
1
Prof. Dr.-Ing. Joaquín Díaz University of Applied Sciences Giessen-Friedberg Germany
GEAB and IFC - Migration of National Standards into International Standards
2
Overview Promise and Reality Information Exchange in CE
GAEB DA2000-XML Migration approaches GAEB - IFC Summary
3
Promise and Reality Trump-Tower Chicago ICE - 3
4
Division of Markets in ACE
Project- manager Architect Engineer Planning Client/ Owner Con- tractor Sub- contrac- tor Construction Manufac- turer Dealer/ Supplier Products
5
Goal of the Common Committee for IT in building and construction
..is a common language for all participants engaged in design, construction and operation of buildings in accordance with technical rules of the German Institute for Standardization (DIN) and the Construction Contract Procedures (VOB): Standardized text for items in bills of quantities/materials Guidelines for tendering procedures Guidelines for structure of bill of quantities data-exchange - excepting CAD data „any process is better than no process“ „a good process is better than a bad process“ „even a good process can be improved“Michael Hammer
6
D81 Specifi- cation of Work D50 Construction Cost Catalog
Planning Architect Engineer Owner/ Client Construction C o n t r a c Products Manu- facturer Dealer/ Supplier D93 Price Inquiry D83 Call for Bids Com- petitors D85 Secondary Bid D84 Bid Submission Bidders D94 Quotation D82 Cost Estima- tion D81 Specifi- cation of Work D96 Order D97 Order Confirmation D86 Contract Award Approved Bidder D88 Change Order D89 Invoice D40 General Catalog D50 Construction Cost Catalog D61 Room Register D71 Workflow Schedule D80 BoQ Catalog D51 Bill of Costs
7
Bill of Quantities/Materials
Specification of Work with Bill of Quantities Drawings and other enclosures Bill of Quantities General description of construction job Purpose, type and use of structure Type and method of construction Reference to structural drawings, site plan For example: Preliminary remarks (if any) Work items (reference numbers)
8
Questions to solve How can we link already existing IFC- elements with Quantity-(cost)-elements How can we take different national systems and regulations into consideration How can we show the benefits for practise How can we calculate and determine quantities in CAD-Systems for the use in bidding systems How can we integrate existing classification systems (e.g. StLB Bau, ..) and cost estimation systems ..
9
IFC-Working group: Exchange of Model Based Quantities
Working since 2005 Goal of WG: approaches for IFC and cost management Common neutral interface definition Quantity determination and calculation Integration of Bill of Quantities Consideration of national approaches (e.g. GAEB, ..) Members: Graphisoft, m-g-h architekten+ingenieure; f:data GmbH,m G&W Software, Dr. Schiller & Partner GmbH, Ingenieurgesellschaft Hartmann, Obermeyer Planen und Beraten, Greiner Ingenieurberatung, Max Bögl, HOCHTIEF, RIB, FZ Karlsruhe, Nemetschek, TLConsulting, Bentley Systems, BouwtaaK KennisCentrum, Springer BauMedien, Autodesk
10
First Results: XML-schema
IFC serves as a basis information model Linking CAD-system “X" with bidding–system “Y” using quantity-elements Small and smart global quantity definitions Consideration of national regulations using external views Linking CAD-system “X" with bidding–system “Y” using room/space/segment-elements
11
Research: MANUBUILD - Approach
Resource Description Framework Web ontology language / GDL WSDL with WSRF Reference: Kopyto/Reinecke
12
Information- and Knowledge exchange
Firma: CIP Ingenieurg. yesterday Physical New input Paper Transport Firma: CIP Ingenieurg. today convert HTTP, XML Digital media tomorrow Firma: CIP Ingenieurg. SOAP Drag / Drop network based documents Xlink OWL, XML
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.