Download presentation
Presentation is loading. Please wait.
Published byCathleen Whitehead Modified over 9 years ago
1
Opequon Targeted Watershed Partner’s Meeting – BMPs Cully Hession, Jim Lawrence, and Andrea Ludwig October 19, 2007
2
Opequon Creek Basin - BMPs Cattle Fencing Bioretention Basin Constructed Floodplain Wetland Water Quality Swale Constructed Floodplain Wetland Pocket Wetland
3
Hedgebrook Farm Constructed Floodplain Wetland Development upstream Cattle access High stream banks Opequon Creek Floodplain Wetland Existing palustrine wetland
4
Hedgebrook Farm Constructed Floodplain Wetland
6
Constructed Floodplain Wetland Costs Planning and design costs Planning and design costs Site visitations Site visitations Engineering time Engineering time Construction costs Construction costs $7K in groundwork $7K in groundwork Grooming and seeding Grooming and seeding Fencing and planting costs Fencing and planting costs DOF funding for wetland plants DOF funding for wetland plants Maintenance costs Maintenance costs Watering system Watering system
7
Town Run Floodplain Wetland Inlet flow path Flow
8
Cedarmeade Pocket Wetland Enhancement of stormwater drainage areas to detain and treat runoff Enhancement of stormwater drainage areas to detain and treat runoff Stormwater flow route ISCO samplers
9
Check dams Grass Waterway Shenandoah University Bioretention
10
Shenandoah University (alternative)
11
McCann Farm Cattle Fencing
12
Summary Proposed 10 Wetlands 10 Wetlands 6 floodplain 6 floodplain 4 pocket 4 pocket 10 WQ Swales 10 WQ Swales 32,000’ fencing 32,000’ fencing Built or In Process 3 Wetlands 2 floodplain 1 pocket 1 WQ Swale (planning) None Add’l Bioretention (planning)
Similar presentations