1 Curb and Gutter Under Construction Completed

2 Curb and Gutter Formwork

3 Curb and Gutter Machine

4 Gutter Flow 𝑄= 𝐶 𝑓 𝑛 𝑆 𝑥 5 3 𝑇 8 3 𝑆 𝑜 1 2 T d Sx 1
𝑄= 𝐶 𝑓 𝑛 𝑆 𝑥 𝑇 𝑆 𝑜 T d Sx 1 Q = flow in gutter (cfs) Cf = coefficient (0.56 for US units, for SI units So = longitudinal slope T = spread (ft) Sx = transverse slope Ref: SCMD p. 372

5 City of Austin Drainage Criteria for Minimum Clear Width
City of Austin, Drainage Criteria Manual, Section 3

6 Flow into a Curb Inlet LT 𝐿 𝑇 = 𝐶 𝑓 𝑄 0.42 𝑆 𝑜 0.3 1 𝑛 𝑆 𝑥 0.6
𝐿 𝑇 = 𝐶 𝑓 𝑄 0.42 𝑆 𝑜 𝑛 𝑆 𝑥 LT = required length to intercept all flow (ft) Q = flow in gutter (cfs) Cf = coefficient (0.60 for US units, for SI units) So = longitudinal slope T = spread (ft) Sx = transverse slope 𝐸=1− 1− 𝐿 𝐿 𝑇 E = efficiency (proportion of flow captured L = actual length (ft) (for L < LT) Ref: SCMD p. 393

7 City of Austin Criteria for Inlets

8 Storm Drain Manhole

9 Storm Sewer Flow