Download presentation
Presentation is loading. Please wait.
Published byMarianna Clarke Modified over 9 years ago
1
Overlap of Project X and Beamline to DUSEL June 2, 2008
2
120 GeV Targeting Overview Neutrino beams utilizing 120 GeV protons from Project X Main Injector Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007 Project X to NuMI Initial studies indicate the technical limit to beam power that could be accepted by an upgraded NuMI beamline is ~ 2 MW - however risk analysis is needed because of reduced redundancy and safety factor for very difficult-to-repair decay pipe and absorber Project X to DUSEL No showstoppers for Project X beam to a new neutrino beam-line - the specified beam parameters for 2.3 MW can be handled by a conventional neutrino beam-line - the target and window cooling are the most challenging aspects
3
Project X R&D Plan ► The R&D program supports a facility scope that includes: Modifications to the NuMI facility to support operations at 2 MW beam power “the new target hall to DUSEL options is not considered in this report”
4
Project X WBS ► ► 8Neutrino Beamline ► ► 8.1Primary Beamline ► ► 8.2Secondary Beamline ► ► 8.2.1Target design ► ► 8.2.2Magnetic Horn Design ► ► 8.2.3Module upgrades ► ► 8.2.4Target Chase Cooling ► ► 8.2.5Decay Pipe Window Replacement ► ► 8.2.6Decay Pipe System ► ► 8.2.7Hadron Absorber Design ► ► 8.3Remote Handling ► ► 8.4Radiological Issues ► ► 8.5Infrastructure ► ► 8.6Project Management
5
Project X WBS that applies to DUSEL ► ► 8Neutrino Beamline ► ► 8.1Primary Beamline ► ► 8.2Secondary Beamline ► ► 8.2.1Target design ► ► 8.2.2Magnetic Horn Design ► ► 8.2.3Module upgrades ► ► 8.2.4Target Chase Cooling ► ► 8.2.5Decay Pipe Window Replacement ► ► 8.2.6Decay Pipe System ► ► 8.2.7Hadron Absorber Design ► ► 8.3Remote Handling ► ► 8.4Radiological Issues ► ► 8.5Infrastructure ► ► 8.6Project Management Design 2 MW Target Corrosion Issues. Detailed Design depends on size of target chase Still in conceptual stage. Repair Facility. May be some overlap, but details depend on crane coverage, component size
6
Horn status Still running with original horns; in midst of 3rd repair of a water line ceramic transition. Have accumulated 18 million pulses since May 2005. See visible corrosion. Horn 2 now
7
High Power IHEP Target Design Primary proton beam Annular channel for water cooling May be suitable for up to 2 MW But ~10% fewer neutrinos / POT (Pions can’t exit out the sides as easily as in the fin designs) “Design Study of the NuMI Target for 2 MW Upgrades” Task A Report of the Accord between FNAL and IHEP
8
WBS Numbers
9
Project X 2 MW engine 400 kW engine DUSEL BeamlineNuMI Beamline Neutrino Speedway
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.