1 Low Impact Development Training Design Exercise Presented by: The Low Impact Development Center, Inc. A non-profit water resources and sustainable design organization www.lowimpactdevelopment.org

2 Copyright 2009 Low Impact Development Center, Inc. Application of Concepts New and Redevelopment New VA and MD SWM Concepts EISA Requirements Objectives

3 Copyright 2009 Low Impact Development Center, Inc.

4 Redevelopment Replace Parking Lot Correct poor drainage around building Improve pedestrian circulation

5 Copyright 2009 Low Impact Development Center, Inc. Redevelopment Program development goals SWM requirements and objectives Identify critical resource areas Opportunities and Constraints Retrofit strategies Retrofit techniques Identify Benefits

6 Copyright 2009 Low Impact Development Center, Inc. New Development Construct new office with similar footprint Connect circulation with existing site Identify potential environmental issues

7 Copyright 2009 Low Impact Development Center, Inc. LID UFC Process Define Planning Goals Perform Site Evaluation Develop LID Strategies Prepare LID Concept Design Target O & M Strategy

8 Copyright 2009 Low Impact Development Center, Inc. % Imperviousness (assume 65%) Rainfall Depth/ESD Runoff Depth QE = PE*Rv 0r ~1.24” Post Cn > Pre and PE>1 inch so calc Cpv Approx 0.4 inch depth over surface so if 30 acres then 4,500 cf Virginia Key Points

9 Copyright 2009 Low Impact Development Center, Inc. Maryland Key Points Redevelopment (Assume 40% imperviousness): Reduce Impervious area by 50% or, ESD/LID for wq for 50% or, ESD and reduction for 50% OR On-site structural or, Off-site structural for 50% or, Or Combination OR Retrofit off-site Stream restoration Trading Planning AND… Implement ESD for NET INCREASE in impervious areas

10 Copyright 2009 Low Impact Development Center, Inc. EISA 438: Norfolk 95 Th Percentile 1.63 Inches

11 Copyright 2009 Low Impact Development Center, Inc. UFC Tools LID Manual NRCS Charts 95th Percentile Charts