Download presentation
Presentation is loading. Please wait.
Published byTrevor Lawrence Modified over 9 years ago
5
USFS Aviation Program 5 th Year of Legacy (P2V) Airtanker Contract EIS study and use of fire chemicals Larger AT strategy to OMB -> Congress Evaluation of small numbers of Waterscoopers
6
Helicopters Natl Contracts Large Fire Support award for 2012 expect 30 IA 34 thru 2012
7
Waterscoopers FS Plans to Evaluate in 2012 Number Unknown but small Tie in with DOI on their Contracts
8
Smokejumper 4 Contract - West, NCSB, Grangeville, Redding Additional? Agency Aircraft – 4 C-23 Sherpa 2 DHC-6 Twin Otter 2 TDC-3
9
Airtankers Large Airtanker Contract 11 P2Vs ** VLAT Contract 1 DC-10 Next Generation Contract up to 3 in 2012 4 additional 2013 Cooperator Aircraft 3 Convair 580s CIFFC/NIFC Agreement 5 Convair 580s MAFFS - 8 Systems BPA Mechanics Support Equipment Depot Level Support
10
Airtanker Availability
11
Approved MAFFS Tanker Bases (Approval level: R=reload, H=hub, F=full activation) Approved ABQAlbuquerque, NMR/H/F BJCJeffco, COR BOI Boise, IDR/H/F CDCCedar City, UTR DRODurango, COR FATFresno, CAR GJTGrand Junction, COR HIFHill AFB, UTR INWPhoenix-Gateway, AZR/H/F LMTKlamath Falls, ORR/H/F PIHPocatello, IDR PRBPaso Robles, CAR PRCPrescott, AZR PUBPueblo, COR ROW Roswell, NMR SBDSan Bernardino, CAR/H/F SMXSanta Maria, CAR TWFTwin Falls, IDR CICChico, CAR WJFLancaster, CAR Activation Sites (no existing pit capability) AUSAustin-Bergstrom, TXF COSPeterson AFB, COH/F CYSCheyenne ANGS, WYH/F DLFLaughlin AFB, TXF DYSDyess AFB, TXF GYHDonaldson Center, SCF MCCMcClellan, CAH/F NTDChannel Is ANGS, CAH/F Awaiting Review MWH Moses Lake, WAR/H/F RDM Redmond, ORR VCVVictorville, CAR PAFB Wainwright AAFR/H/F RTSReno SteadR ISOKinstonR/H/F BIL or HLN (Montana)R/H/F HIB or Ely (Minnesota) 18 Apr 2012
12
Questions ? Discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.