Download presentation
Presentation is loading. Please wait.
Published byEunice Flowers Modified over 9 years ago
1
Cisco Confidential 1 © 2011 Cisco a/o its affiliates All Rights Reserved Case Study 2 Component Description Standard Test and Operational Platform Data Collected: Country-of-Origin –Specific location –Date of manufacture Ship Readiness SW Licensing info. Component Traceability Component Description Standard Test and Operational Platform Data Collected: Country-of-Origin –Specific location –Date of manufacture Ship Readiness SW Licensing info. Component Traceability Component Description Standard Test and Operational Platform Data Collected: Country-of-Origin –Specific location –Date of manufacture Ship Readiness SW Licensing info. Component Traceability PCBA Component Traceability Standard Test and Operational Platform Security: Certificate Generation & Injection Data Collected: Country-of-Origin Date of manufacture Lot Code Ship Readiness
2
Cisco Confidential 2 © 2011 Cisco a/o its affiliates All Rights Reserved PCBA Board Case Study 2
3
Cisco Confidential 3 © 2011 Cisco a/o its affiliates All Rights Reserved Ships Case Study 2 PCBA Board End-to-end Board-level Traceability Data Base End of animation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.