Presentation is loading. Please wait.

Presentation is loading. Please wait.

A2 Technology Product Design Systems and Control Notes DT4 - Exam.

Similar presentations


Presentation on theme: "A2 Technology Product Design Systems and Control Notes DT4 - Exam."— Presentation transcript:

1 A2 Technology Product Design Systems and Control Notes DT4 - Exam

2 Project Management 3

3 Managing Time How can you plan your time? How do designers plan their time?

4 Project management strategies

5 Project Management Flowcharts –http://en.wikipedia.org/wiki/Flowchart Gantt Charts –http://en.wikipedia.org/wiki/Gantt_chart PERT –http://en.wikipedia.org/wiki/PERT Critical Path analysis –http://en.wikipedia.org/wiki/Critical_path_analy sis

6 Gantt Chart

7 PERT The Program (or Project) Evaluation and Review Technique, commonly abbreviated PERT, is a model for project management designed to analyze and represent the tasks involved in completing a given project.project managementproject

8 Critical Path The Critical Path Method, abbreviated CPM, or critical path analysis, is a mathematically based algorithm for scheduling a set of project activities. It is an important tool for effective project management.algorithmproject management PERT chart for a project with five milestones (10 through 50) and six activities (A through F). The project has two critical paths: activities B and C, or A, D, and F - giving a minimum project time of 7 months with fast tracking. Activity E is sub-critical, and has a float of 2 months.


Download ppt "A2 Technology Product Design Systems and Control Notes DT4 - Exam."

Similar presentations


Ads by Google