Download presentation
Presentation is loading. Please wait.
Published byGervais Harmon Modified over 9 years ago
1
Ch 5-1 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Cost Analysis and Estimating for Engineering and Management Chapter 5 Forecasting
2
Ch 5-2 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Overview l Working with Data Graphing, Statistics Regression / Curve Fitting Confidence / Correlation l Time Series Moving Averages, Smoothing l Cost Indexes
3
Ch 5-3 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Business Forecasting l Prediction Price of Material Cost/Amount of Labor Market Demand/Price l Term Short 2 Years Medium 2 - 5 Years Long Range > 5 Years
4
Ch 5-4 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Graphical Analysis l Descriptive Statistics Collect/Organize/Analyze Data Summarize/Present Draw Conclusions/Make Decisions l Raw Data Communicates Little Information
5
Ch 5-5 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Simplifying Data Price, ($/roll)ObsRel FreqCum Freq 12.35–12.7510.003 12.75–13.1560.0190.022 13.15–13.55330.1020.124 13.55–13.95510.1570.281 13.95–14.351210.3730.654 14.35–14.75500.1540.808 14.75–15.15440.1360.944 15.15–15.65130.0400.984 15.65–16.0550.0161.000 3241.000
6
Ch 5-6 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Graphical Presentation
7
Ch 5-7 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Frequency Curves
8
Ch 5-8 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Mean l Average Eq 5.1
9
Ch 5-9 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Median & Mode l Median All Data from Lowest to Highest Number in the Middle l Mode Data Value(s) that Appear the Most Often
10
Ch 5-10 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Standard Deviation l Amount of Data Spread Around the Mean l Variance Is the Square of the Standard Deviation Eq 5.2
11
Ch 5-11 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Graph the Data l Pure Statistics Can Be Misleading l Any Set of Numbers Will Have Mean, Std Dev, etc. May or May Not Be Relevant l Plot the Data Visual Interpretation Apply “Judgment”
12
Ch 5-12 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Mathematical Model l Draw Line Through Data l Half of Points Above Line, Half Below l Straight Line y = a + bx Determine a and b from Graph
13
Ch 5-13 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example
14
Ch 5-14 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Why Graph? l Visual Analysis of What Is Happening l Non-Linearity May Be Exposed l Incorporates “Reasonableness” l Mathematical Methods Can Assist in Establishing the “Best Fit” Line Through the Data
15
Ch 5-15 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Regression Analysis Finds Dependent y for Given x If x Is Time Called Trend Line Used for Forecasting
16
Ch 5-16 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Least Squares l Minimize Variation (Error) Between Observed (Real) Values Fitted Curve (Predicted) Values l Minimize Sum of the Squares of the Errors
17
Ch 5-17 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Normal vs. Student-t Distribution
18
Ch 5-18 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Distribution Applied to Regression
19
Ch 5-19 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Mathematical Calculations l Error l Sum of the Squares Eq 5.4 Eq 5.5
20
Ch 5-20 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management The Least Squares Equation l y = a + bx The Least Squares Line Goes Through ( X, Y ) Eq 5.8 Eq 5.9
21
Ch 5-21 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example Year x Index y x2 x2 xy y 2 2 0870084.8752.1254.516 1891 87.2641.7363.013 290418089.6540.3460.120 392927692.043-0.0430.002 4931637294.432-1.4322.051 ………………… 1051524101511337 63.168
22
Ch 5-22 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example Calculations Find a and b Y = 84.875 + 2.389 X
23
Ch 5-23 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Confidence Limits
24
Ch 5-24 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management l Variance Around Regression Line l Degrees of Freedom Equations Eq 5.19 Eq 5.11
25
Ch 5-25 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Confidence Limits l Based on Student-t Tables l Regression Line Passes Through y Variation of y Equals Constant Variation of regression line Eq 5.14
26
Ch 5-26 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management In General l Variance of y Due to Variance of y l Variance Applied to y Eq 5.15 Eq 5.16
27
Ch 5-27 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Compounded Variance l Variance of Predicted Value Eq 5.17 Eq 5.18 Eq 5.19
28
Ch 5-28 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Confidence vs Prediction l Confidence Interval Variation Around Expected Y Value l Prediction Interval Variation Around a Single Y Value Greater In Magnitude
29
Ch 5-29 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Variance from Intercept X = 0 at Intercept a Eq 5.20 Eq 5.22 Eq 5.21 Eq 5.23
30
Ch 5-30 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Confidence Intervals
31
Ch 5-31 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Non-Linear Relationships l Curvilinear Regression Exponential Eq 5.24 Power Eq 5.25 Polynomial Eq 5.26
32
Ch 5-32 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Non-Linear Calculations l Convert to Log Representation For y = ab x ( Exponential Function ) Eq 5.27 Eq 5.28
33
Ch 5-33 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Another Version For y = ax b (Power Function) Eq 5.29 Eq 5.30
34
Ch 5-34 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Example xylog xlog y(log x) 2 log x log y 105101.00002.70761.00002.7076 302101.47712.32222.18193.4302 1001902.00002.27884.00004.5575 1501252.17612.09694.73544.5631 300712.47711.85136.13614.5858 9.130311.256718.053419.8441
35
Ch 5-35 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Finding a and b Eq 5.29 Eq 5.30
36
Ch 5-36 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Polynomial Regression l Linear Relationship Unknown Eq 5.31
37
Ch 5-37 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Correlation
38
Ch 5-38 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Correlation l Sometimes There Isn’t Any l Quantitative Measure -1 r 1 l Farther from 0, Stronger Correlation Eq 5.33
39
Ch 5-39 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Multiple Linear Regression l More than 1 Independent Variable l Graphical Representation Difficult l Mathematical Form Eq 5.34
40
Ch 5-40 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Finding Constants l Solve Simultaneously Eq 5.35
41
Ch 5-41 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Regression Assumptions The Values of x Are Controlled l Regression is Linear l Deviations are Mutually Independent Deviations Are Not a Function of x l Deviations Are Normally Distributed l Model Contains ALL Relevant Variables
42
Ch 5-42 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Time Series Models l Used for Forecasting l Fundamentals Consistent Data Collection Types of Behavior Moving Average Smoothing l Data Added on Revolving Basis
43
Ch 5-43 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Time Series Data l Collected at Successive Periods l Usually Equally Spaced l Is the Underlying Process Constant Variable Trend-Cycle Seasonal Regular
44
Ch 5-44 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Typical Time Series Models
45
Ch 5-45 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Moving Average l Places More Reliance on Recent Data l Recent Data Better Predicts Future N Determines Rate of Response Eq 5.36
46
Ch 5-46 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Smoothing l “Weighted” Moving Average l Exponential Smoothing Eq 5.38
47
Ch 5-47 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Smoothing Constant Variations in values Drift in data Small, = 0Little, = 0.5Large, = 1 None ModerateVery smallSmallModerate LargeSmallModerateLarge
48
Ch 5-48 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Cost Index l Dimensionless Number l Represents Change in Cost l Over a Period of Time l Relative to a “Benchmark” Period l What is Costed Remains Constant l Used to Forecast
49
Ch 5-49 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Using Cost Index Compares Known Cost at Period r Using Current I c and Reference I r Indexes Eq 5.39
50
Ch 5-50 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Figuring Cost Indexes l Benchmark Cost Used as Denominator l Index for Benchmark Period = 1 or 100 l Costs for Other Periods Divided by Benchmark Cost
51
Ch 5-51 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Rate of Change l Differences Between Periods Percent Change Current index, period 5106.8 Less previous index, period 4102.3 Index point change+4.5 Divide by previous index102.3 Equals+0.044 = + 4.4%
52
Ch 5-52 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Change Rate l Figuring Average Rate of Change l Using Rate of Change to Find Index Eq 5.40 Eq 5.41
53
Ch 5-53 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Composite Index Material0*123 Laser glass$26,117$24,027$22,345$21,228 Steel tubing1913200821292278 Al extrusion418426439456 Printed circuits637643656657 Harness cable2103212421342305 Glass tubing4317418741034185 Total$35,505$33,415$31,806$31,119 Index, %100.094.189.687.6 * Benchmark Period
54
Ch 5-54 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Indexes l Basis Changes (Qty, Qual, Mix, etc) l Technology Creep l Kinds of Indexes Material Labor Geographical l Index Specific for Time and Location
55
Ch 5-55 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Caveats l Results Depend on Good Data l Cause and Effect Relationship l Eliminating Spurious Data l Backcast Period Forecast Period l Limit Number of Variables l Use Judgment l Test for “Reasonableness”
56
Ch 5-56 © 2004 Pearson Education, Inc. Pearson Prentice Hall, Pearson Education, Upper Saddle River, NJ 07458 Ostwald and McLaren / Cost Analysis and Estimating for Engineering and Management Summary l Objective - Forecasting l Methods for Working with Data Graphing, Statistics, Regression l Data In Time Periods (Time Series) l Cost Indexes Applications, Calculations, Caveats
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.