A:B: Sill PlatesGirders #1 Heavy beams that support the inner ends of the floor joists are called? C:D: Subflooringbridging
4
Girders
5
A:B: poststud #2 what is a vertical upright framing member that goes from the bottom plate to the top plate? C:D: joistvertex
6
stud
7
A:B: underlaymentrafters #3 The subfloor is nailed to the________? C:D: joistfoundation
8
Joist
9
A: B: Framing SquareTry square #4 Tool used for laying out wall plates. C:D: hammerCircular saw
10
Framing Square
11
A:B: Benchmarkseat #5 A recess in a foundation wall to support a girder is called a _______________ C:D: casementpocket
13
A:B: masoncarpenter #6 It is usually the responsibility of the _______ to lay out building lines C:D: architectFoundation inspector
14
carpenter
15
A:B: Balloon framePlatform frame #7 The most widely used framing method in residential construction is C:D: Post and beam Random plank
16
Platform frame
17
A:B: Floor joistsSill plate #8 Anchor bolts are used to attach_________ to the foundation. C:D: girderA,B, and C
18
Sill plate
19
A:B: 16” O.C.18”O.C. In conventional framing floor joists are usually placed ________ C:D: Prior to the GirderBelow the sill plate
20
16”O.C.
21
A:B: Crown downCrown up #10 Joists are installed with the C:D: Lap-spiked together over the sill plate A and B
22
Crown up
23
A:B: Sole plateTop plate #11 The bottom horizontal member of a wall frame is called the______? C:D: Double plateSill plate
24
Sole plate or bottom plate
25
A:B: bracestrimmers #12 Shortened studs that carry the weight of the header are called_________ ? C:D: CrippleCorner posts
26
trimmers
27
A:B: Vary their spacing between 8” and 10” Mark their location on the sill plate. #13 When laying out studs__________. C:D: Keep the studs directly in line with joists below. A.B. And C.
28
Keep them directly in line with the joists below
29
A:B: Speed squarekitchen #14 Rafter tables come in booklet form and are also stamped on the ____________. C:D: Framing square Floor plan
30
Framing square
31
A:B: 6 and 126 and 14 #15 laying out and stepping off a hip rafter with a 6”slope you would hold ____________ on the framing square. C:D: 6 and 176 and 24
32
6 and 17
33
Great Job!!!! Great Job!!!! Thank you for playing! Thank you for playing!