Presenter Name Facility Name UK Testbed Status and EDG Testbed Two. Steve Traylen GridPP 7, Oxford
2
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Outline Status of the UK Sites. Release of EDG 2. UK Certificates. Grid monitoring in the UK.
3
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Manchester CE SE(1.5TB) EDG 1.4 80xWN CE SE(5TB) EDG 1.4 60xWN CE SE EDG 1.4 9xWN EDG Testbed BaBar Farm DZero Farm GridPP and BaBar VO Servers. User Interface Plan that DZero farm will join LCG. SRIF bid in place for significant HEP resources for the end of the year.
4
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 UCL CE SE EDG 1.4 1xWN EDG Testbed Network Monitors for WP7 development. SRIF bid in place for 200 cpus for the end of the year to join LCG1.
5
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 RAL PPD CE SE EDG 1.4 9xWN EDG Testbed CE SE EDG 2.0 1xWN RGMA Testbed MON User Interface Plan to be a portion of the Southern Tier2 Centre within LCG1. 50 cpus and 5TB of disk expected for the end of year.
6
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Birmingham CE SE EDG 1.4 1xWN EDG Testbed Expansion to 60 cpus and 4TBs. Expect to participate within LCG1/EDG2 Liverpool CE SE EDG 1.4 1xWN EDG Testbed Currently unmaintained. Plan to follow EDG 2, possibly integrating BaBar farm.
7
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 RAL CE SE EDG 1.4 5xWN EDG Testbed CE EDG 1.4 230xWN Teir1/a CE SE EDG 2.0 RGMA Testbed MON CE SE EDG 2.0 1xWN EDG Dev Testbed MON SE ADS UI within CSF. NM for EDG2. Top level MDS for EDG. Various WP3 and WP5 dev nodes. VOMS for DEV TB. http://ganglia.gridpp.rl.ac.uk/ SE LCG0 Testbed CE 1xWN
8
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Cambridge CE SE EDG 1.4 15xWN EDG Testbed Farm shared with local NA-48, GANGA users. Some RH73 WNs for ongoing Atlas challenge. 3TB GridFTP-SE. Plan to join LCG1/EDG2 later in the year with an extra 50 cpus later this year. EDG jobs will soon be fed into the local E-Science farm. http://farm002.hep.phy.cam.ac.uk/cavendish/
9
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Bristol CE SE EDG 1.4 1xWN EDG Testbed CE SE EDG 2.0 1xWN RGMA Testbed MON CE SE CMS-LCG0 CMS/LHCb Farm 24xWN CE SE EDG 1.4 BaBar Farm 78xWN GridPP RC. Plan to join EDG2 and LCG1
10
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Imperial College CE SE EDG 1.4 EDG Testbed WNs CE EDG 1.4 WNs BaBar Farm CE SE CMS-LCG0 WN CE SE EDG 2.0 1xWN RGMA Testbed MON RB and BD-II for EDG 1.4. RB and BD-II for EDG 2.0. Plan to be in LCG1 and other testbeds.
11
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Queen Mary CE SE EDG 1.4 1xWN EDG Testbed 32xWN CE also feeds EDG jobs to 32 node E-Science farm. Plan to have LCG1/EDG2 running for the end of the year. Expansion with SRIF grants.(64WN+2TB in Jan 2004, 100WN + 8TB in Dec 2004.) http://194.36.10.1/ganglia-webfrontend
12
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Oxford CE SE EDG 1.4 2xWN EDG Testbed Plan to join EDG2/LCG1. Nagios monitoring has been set up. (RAL is also evaluating Nagios.) Planning to send EDG jobs into 10 WN CDF farm. 128 node cluster being ordered now.
13
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Glasgow CE SE EDG 1.4 ScotGRID 59xWN New hardware expected soon. WNs on a private network with outbound NAT in place. As ScotGRID grows plans to be part of LCG. Various WP2 development boxes. CE SE EDG 2.0 RGMA Testbed MON
14
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 UK Overview Now significant resources within EDG. Integrating EDG to farm has been repeated many times but it is difficult. Sites are keen to take part within LCG1 or EDG2. By the end of the year many HEP farms plan to be contributing to LCG1 resources.
15
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 EDG 2.0 Now in a permanent state of immanent release. Since 27 th May: – 25 pre releases. – 295 configuration changes. –Range from a typo to a new resource broker.
16
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Criteria for cutting EDG 2.0 For EDG 2.0 to the following must be satisfied. –50 sequential jobs. 98% success. –250 jobs being ran by 1 RB. 80% success. –5 jobs with 2GB i/o sandbox. 80% success. –25 jobs which require two proxy renewals. 80% –Upload and register 1GB file to an SE, replicate to a mass storage device. –Register 1000 files in less than 1000s. –Match a job against three files on an SE.
17
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Installation of an EDG2 Testbed LCFGng recommended installation method - No manual install instructions yet. –Significantly better than LCFG. Configuration (site-cfg.h) is less cryptic. Less hand installation required. –Install host certificates. –PBS server. –MySQL tables. –mkgridmap.conf.
18
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
19
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Integration after 2.0. Use gcc3.2.2 throughout. –Currently used by RB and the APIs the RB uses. GridFTP access to castor. Integration of VOMS. –Currently ongoing in parallel. –Has no impact on existing software. This will be EDG 2.1
20
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Required Nodes CE: gatekeeper, MDS, gin,.. SE: GridFTP, WP5-SE, gin, … WN: PBS batch worker + client tools. MON: Servlets for a site, GOut for the RB. Also collects fabric monitoring information… –On small sites can be moved to the CE. Generally configuration is more modular.
21
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 LCG1 or EDG2 Which testbed should I join? –Significant resources best suited to LCG1. –Small dynamic testbeds can contribute to continued development of testbed two.
22
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 UK Certificates UK EScience CA was added to production EDG testbed 3 weeks ago. UK Hep CA will stop issuing certificates. –Existing certificates will still be valid for the remainder of their lifetime.
23
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Ratio of UKHep to EScience Certs
24
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 EScience Certs by OU.
25
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 VO Membership + EDG Guidelines
26
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Ganglia Ganglia provides time plots of system metrics. In use at RAL, Cambridge and QMUL. By default load, network i/o, memory. Trivial to add new metrics, e.g. active MySQL connection for CMS. Expansion to the UK possible via LCFG objects and instructions, however WP4 tools might be a used instead. Data could be collected centrally for a UK view.
27
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
28
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
29
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 GridPP Map Checks HEP sites every 6(?) hours for: –Ping –Globus Submission –EDG Job Submission via Imperial RB. –EDG Job Submission via LYON RB. http://www.gridpp.ac.uk/map/
30
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
31
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 GridPP RB Monitoring @ Imperial Publishes service status. Publishes times for LDAP queries of resources. http://www.hep.ph.ic.ac.uk/~dguser/diagnostics.html.http://www.hep.ph.ic.ac.uk/~dguser/diagnostics.html Imperial also submits test jobs, more sophisticated jobs than the map, e.g. check for the existence of a CloseSE. http://www.hep.ph.ic.ac.uk/~dguser/Qstatus.html
32
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
33
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003
34
Steve Traylen, s.traylen@rl.ac.uk PPD 28th April 2003 Monitoring Currently lots of monitoring but no central location. Most monitoring currently only shows the current state. The Grid operations centre can coordinate much of this.