Presentation is loading. Please wait.

Presentation is loading. Please wait.

Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:

Similar presentations


Presentation on theme: "Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:"— Presentation transcript:

1 Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, ndamour@sierrawireless.com Meeting Date: 2014-09-22ndamour@sierrawireless.com Agenda Item: 6 - Reports from Ad-Hoc Groups

2 Issues for DECISION in TP © 2014 oneM2M Partners TP-2014-0491 2 Work Item and Deliverables Current oneM2M Methods of Work, v0.8.0, section 7.3, step 3: An active Work Item is required to make changes to a deliverable. Changes to a TP approved Deliverable may be made under a new or an existing WI. The TP may take one of several actions toward correction: Use, Reactivate, or Revise the original Work Item for the deliverable Revise an active Work Item for the deliverable. Open a new Work Item for the deliverable. Defer action for inclusion at a future time and/or in a future Release. Proposal Agree that Work Items are not closed automatically and can be updated Work with MP/MoW groups to include appropriate wording Ask all working groups to update the relevant Work Items

3 Issues for DECISION in TP © 2014 oneM2M Partners TP-2014-0491 3 oneM2M Webinars Part of the communication plan leading up to the oneM2M event in Dec. Precise scope and number of webinars still under discussion (come to the WPM/MARCOM meeting on Wednesday) Probably around 3 to 4 webinars planned Webinar content need to be formally reviewed and sanctioned? If yes, by which group? Two proposals: – All webinars posted to WPM and formally reviewed by WPM – General scope and number of webinars reviewed by WPM, then WPM tasks specific Working Group(s) to review and sanction specific webinars

4 Issues for DISCUSSION in TP © 2014 oneM2M Partners TP-2014-0491 4 Candidate release documents list NumberDocument NameVersionInternal TS-0001Functional ArchitectureV-2014-08V1.0.0 TS-0002RequirementsV-2014-08V0.6.2 TS-0003Security SolutionsV-2014-08??? TS-0004Core ProtocolV-2014-08??? TS-0005Management Enablement – OMAV-2014-08??? TS-0006Management Enablement – BBFV-2014-08??? TS-0008CoAP Protocol BindingV-2014-08??? TS-0009HTTP Protocol BindingV-2014-08??? TS-0011Definitions and AcronymsV-2014-08???

5 Items for INFORMATION oneM2M showcase demos oneM2M/ESMIG Home Energy Management showcase ESMIG; Sierra Wireless; Vodafone; Kamstrup; Qualcomm; GridPocket; LAAS-CNRS Vehicle to Home Solution - Cross Vertical Application via Horizontal oneM2M Platform LG Electronics; LG U+; Modacom; Eluon Smart City Services and Multiple Service Layer Platforms Interworking KETI; InterDigital; NEC; Fraunhofer; SK Telecom oneM2M enriched personal life Huawei Technologies Co., Ltd.; China United Network Communications Group Co. Ltd. A oneM2M-based Continua Compliant Healthcare System and Interworking of Multiple oneM2M Service Layer Platforms Lamprey Networks; InterDigital Communication; Personal Connected Health Alliance (Continua) Connected Vehicle Cloud based on oneM2M platform Ericsson oneM2M Business Application(s) for Smart Energy and Building Monitoring for Predictive Maintenance TELIT / ILS Technology LLC © 2014 oneM2M Partners TP-2014-0491 5

6 Items for INFORMATION Updates of deliverables status for preparation of ADM-0001- oneM2M_Work_Programme-V13_00_00 Work expected on Release Management / Versioning Meetings held since last TP#12 in Sophia Antipolis WPM#12.1 on August 13th (convened by J. Koss) WPM#12.2 on September 2nd WPM#12.3 on September 16th Upcoming planned meetings WPM#13.0 on September 24th (this week!) with MARCOM WPM#13.1 on October 8th 13:30-15:30 UTC (tbc) WPM#13.2 on October 22nd 13:30-15:30 UTC (tbc) © 2014 oneM2M Partners TP-2014-0491 6


Download ppt "Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:"

Similar presentations


Ads by Google