Frankfurt (Germany), 6-9 June 2011 Manfred Wurm EVN Netz GmbH, Austria Wurm – Austria – Session 3 – 0915 EARTH FAULT DISTANCE LOCALIZATION IN INDUCTIVE EARTHED NETWORKS BY MEANS OF DISTANCE PROTECTION RELAYS
2
Frankfurt (Germany), 6-9 June 2011 Earth fault location in inductive earthed grids: ► detection of the faulty feeder in the substation ► signalling to the system operator Localization of earth fault position: ► by means of commutations ► personell must find the fault position wish to get information about fault distance, e.g. Xprim Wurm – Austria – Session 3 – 0915 Cause
3
Frankfurt (Germany), 6-9 June 2011 usually: natural residual fault current is too less to pick-up a distance protection device therefore: increasing the fault current by means of an additional ohmic current (« pilot current ») in the neutral of the network Wurm – Austria – Session 3 – 0915 Principle and idea
4
Frankfurt (Germany), 6-9 June 2011 Wurm – Austria – Session 3 – 0915 Fault calculation: conventional
5
Frankfurt (Germany), 6-9 June 2011 Wurm – Austria – Session 3 – 0915 Fault calculation: modified
6
Frankfurt (Germany), 6-9 June 2011 Method A: Method B: Wurm – Austria – Session 3 – 0915 How to obtain the realistic value of the fault current I F, measured at the busbar?
7
Frankfurt (Germany), 6-9 June 2011 Three manufacturers Areva (now Schneider) Siemens Sprecher Automation implemented the modified fault distance calculation in their existing relays 1 st step: earth fault testand 2 nd step: field test in a 20-kV-grid of EVN Wurm – Austria – Session 3 – 0915 Reality check
8
Frankfurt (Germany), 6-9 June 2011 selection: area with difficult atmospheric conditions substation with 4 outgoing feeders (20 kV), 3 of them are test feeders ► with mixed ratio of OHL and cable ► equipped with one modified distance device of each manufacturer stated above additionally installation of a fault recorder Wurm – Austria – Session 3 – 0915 Preparation of field test and installation
9
Frankfurt (Germany), 6-9 June 2011 Size of pilot current: ► R add = 60 max. ≈ 200 A pilot current ► on-time = 0,25 s Influence of load current: (20 kV: 30 A ≈ 1 MVA) load current and pilot current will add Wurm – Austria – Session 3 – 0915 Further particulars substation normally open DIST O/C, directed recloser 160A / 0,5s 200A / 0,8s 200A / 0,5s 300A / 1,0s 200A / 0,4s 0,05s / 0,8s / 2,5s 400A / 2,0s
10
Frankfurt (Germany), 6-9 June 2011 Start: January 11 th, 2011 Aim: calculated fault distance should indicate the fault position within one third of the total length of the feeder. Wurm – Austria – Session 3 – 0915 Preparation of field test and installation circuit breaker resistor Hope: a lot of earth faults until presentation at CIRED 2011
11
Frankfurt (Germany), 6-9 June 2011 Fault 1: Split of conductor in L2: X,real = 3,73 X,classic = 1,41 X,improved = 2,98 Wurm – Austria – Session 3 – 0915 Results V 1E V 2E V 3E V NE I R I L 23 A
12
Frankfurt (Germany), 6-9 June 2011 Fault 2: ??? in L1 X,real = ??? X,classic = 10,09 X,improved = 3,88 Wurm – Austria – Session 3 – 0915 Results V 1E V 2E V 3E V NE I R I L 55 A
13
Frankfurt (Germany), 6-9 June 2011 Wurm – Austria – Session 3 – 0915 Thank You for Your attention!