Presentation is loading. Please wait.

Presentation is loading. Please wait.

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.

Similar presentations


Presentation on theme: "Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight."— Presentation transcript:

1 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup – European Gas Balancing Code Development Project Chris Shanley

2 2 ENTSOG

3 3 The Goal  Producing a network code in twelve months In line with the framework guidelines on balancing Compliant with the provisions on balancing in Regulation (EC) 715/2009 Taking due account of stakeholder input  Fulfilling of Regulation (EC) 715/2009 requirement that ENTSOG “conduct an extensive consultation process, at an early stage and in an open manner, involving all relevant market participants“

4 4 Where does the Network Code stage sit? Priority setting EC Revisio n of NC ENTSO G Approv al EC Comitology Framewor k guideline ACER Approva l EC Network code ENTSOG Revie w ACER 6 months 12 months maximum3 months + x months

5 5 Phases in ENTSOG’s Network Code Development PROJECT PLAN CONSULTATION INTRODUCTORY WORKSHOP STAKEHOLDER JOINT WORKING SESSIONS FORMAL CONSULATION REFINEMENTWORKS HOP CONSULATION WORKSHOP INFORMAL, BI-LATERAL and ADHOC INTERACTIONS AS REQUIRED THROUGHOUT THE PROCESS STAKEHOLDER SUPPORT PROCESS KICK OFF MEETING LAUNCH DOCUMENTATION STAKEHOLDER INVOLVEMENT

6 6 Project Plan Phase - 26 Oct to 13 Dec  Project plan consultation  “ A short consultation on the process ENTSOG plan to use to deliver a network code”  Will provide an in-depth description of the three phases of the network code development  Specifically looking for feedback on : Your level of involvement - four categories proposed The proposed timeline The Proposed topics for each of the SJWS  Feedback received CAM network Code consultation process has been taken into account in the project plan

7 7 Code Development Phase – 13 Dec to 12 June  Develop code proposal  ENTSOG intend to interact with Stakeholder in several ways in this phase:  Project launch Workshop  Stakeholder Joint Working Sessions  Network Code Consultation Draft network code Comprehensive consultation document Workshop during consultation period

8 8 SJWS  Stakeholder Joint Working Sessions (SWJS)  Were successfully used in CAM process  It is a round table session on specific topics for the network code in order to get Stakeholders views early in the process, thereby helping to shape the development of the network code  Held in Brussels SJWS time schedule NovDecJan Feb Mar Apr JuneJuly 13/14 Kick Off 11/12 SJWS 26 SJWS 11 NC Consultation Workshop 12 May 09 SJWS 23 SJWS 07 SJWS 13 ------- Consultation---------------

9 9 Formal Consultation - 13 April to 12 June ENTSOG will release a consultation package:  A draft network code  An accompanying consultation document Rational for decisions Highlighting specific area seeking feedback  A workshop within the 2 month period Address any initial queries stakeholders may have Stakeholders will have 2 months to respond to this consultation

10 10 Code Decision Making Phase - 12 June to 30 Oct  Refine and approve code  Submit code to ACER (Nov 2012)  ENTSOG intend to interact with Stakeholders in several ways in this phase:  Conclusions Workshop  Stakeholder Support Process


Download ppt "Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight."

Similar presentations


Ads by Google