Mid Term Review Meeting, 26 September 2012D. Lanaia1 * The research project has been supported by a Marie Curie Early Initial Training Network Fellowship of the European Community’s Seventh Programme under contract number (PITN-GA-2010- 264330-CATHI) CATHI Marie Curie Initial Training Network Cryogenics, Accelerators and Targets at HIE-ISOLDE Davide Lanaia(BE - OP)* WP5, ESR 7 Mid Term Review Meeting, 26 September 2012
2
Mid Term Review Meeting, 26 September 2012D. Lanaia2 Outline Background; Activity at CERN; Project Status and Achievement; Experience in the project; Training; Conclusions.
3
Mid Term Review Meeting, 26 September 2012D. Lanaia3 My Background 2007: Bachelor degree in telecommunication engineering from Catania University with thesis at INFN-LNS (Istituto Nazionale di Fisica Nucleare – Laboratori Nazionali del Sud) on ECR (Electron Cyclotron Resonance) Plasma Ion Source. 2010:Master degree in telecommunication engineering from Pisa University with thesis in collaboration with NURC (NATO Undersea Research Centre) on HF Radar and their use as a surveillance radar. From 2010 to November 2011: Stage at INFN-LNS on plasma heating, Bernstein’s wave propagation in a plasma source, dissociation of toxic molecular by use of a plasma chamber. From 2011 until now: Marie Currie fellow @ CERN in BE - OP (Beams Department - Operation) for the HIE – ISOLDE Project.
4
Mid Term Review Meeting, 26 September 2012D. Lanaia4 My work @ CERN HEBT Layout; REX-LINAC Operation; Setting Converter Application; Cavities Phasing up & Calibration Application; Emittance Study; Stripping Foils Study;
5
Mid Term Review Meeting, 26 September 2012D. Lanaia5 Activity @ CERN Objectives The ESR training will be focused on the development of machine tune-up procedures that will later be implemented in the control software for the linac operation and active participation in the startup of the machine. Description of work 1.Draft the specification of the controls and of the beam monitoring tools specific to the HIE-REX Linac 2.Definition of tuning procedures and management of machine protection and alarm system 3.Draft console applications to be used by the operators for the Linac tuning and monitoring 4.Follow progress of the different aspects of the Linac design, construction and installation 5.Assist in the commissioning of the new machine Deliverables D19.Report on commissioning schedule, general tuning procedure, specifications for controls and beam diagnostics D20.Commissioning report. Final conference report and/or journal publication WP 5 All my work @ CERN is related to the WP which I belong: SC - LINAC COMMISSIONING
6
Mid Term Review Meeting, 26 September 2012D. Lanaia6 Activity @ CERN Experiments High energy driver beam protons REXEBIS REXTRAP MASS SEPARATOR 7-GAP RESONATORS @ 101.28 MHz IH RFQ 9-GAP RESONATOR @ 202.56 MHz 3.0 MeV/u 2.2 MeV/u 1.2 MeV/u 0.3 MeV/u ISOLDE beam 60 keV Rebuncher Primary target ISOLDE Actual Layout of REX – ISOLDE Courtesy E. Piselli
7
Mid Term Review Meeting, 26 September 2012D. Lanaia7 Activity @ CERN 3 MeV/u 5.5 MeV/u 10 MeV/u
8
Mid Term Review Meeting, 26 September 2012D. Lanaia8
9
Mid Term Review Meeting, 26 September 2012D. Lanaia9 Project Status and Achievement D19: Already achieved, document published. M17: Already achieved, trained by the other operators. M18: On going (Emittance, Stripping Foil test, ToF Measurement). TC7: Tests on my application were performed.
10
Mid Term Review Meeting, 26 September 2012D. Lanaia10 Project Status and Achievement “Status of the HIE-ISOLDE Super Conducting Linac Design” article for IPAC 12 “HIE-ISOLDE SC Linac: Operational aspect and commissioning preparation” poster for IPAC12 “Beam Diagnostic Boxes for HIE-ISOLDE” EDMS Document; “Stripping Foil Data Analysis” EDMS Document; “Notes on the HIE ISOLDE Layout and Naming Convention” EDMS Document;
11
Mid Term Review Meeting, 26 September 2012D. Lanaia11 Experience in the project HEBT Layout: Weekly meeting
12
Mid Term Review Meeting, 26 September 2012D. Lanaia12 Experience in the project REX – LINAC Operation Trained by my supervisor & the other operators Help colleagues to performs measurement (i.e. Faraday cup test, Silicon Detector study and TOF System) Have contacts with ISOLDE users Use and understanding of the existing operational tool (Farday cups, Eq array, Mass Scan, etc etc)
13
Mid Term Review Meeting, 26 September 2012D. Lanaia13 Experience in the project Converter & Phasing up application Application already up and under test in the ISOLDE Console Manager
14
Mid Term Review Meeting, 26 September 2012D. Lanaia14 Experience in the project Emittance & Stripping foil study Characterize the properties of the actual beam
15
Mid Term Review Meeting, 26 September 2012D. Lanaia15 Training & Secondment Technical Training: Java, JUAS School, Radioprotection course; Language Training: French Course @ CERN School: First International School on Laser Applications at Accelerators Secondment: INFN-LNL; TRIUMF Visited: INFN-LNL; TRIUMF; all CERN
16
Mid Term Review Meeting, 26 September 2012D. Lanaia16 Conclusions A lot of work was done during this 10 months and more needs to be done Great working experience, huge possibility for our future. Thanks to the CATHI Project. Thanks for your attention.
Similar presentations