MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015.

Similar presentations


Presentation on theme: "MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015."— Presentation transcript:

1 MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015

2 Above of Reservoir Tilt Events in MWSS Diatomite 21S area from 6/29/2015 to 7/5/2015 Map as per DOGGR’s letter Tilt event Activity Summary Offset Operator (TRC): No above reservoir tilt events in TRC property during the reporting period. There have been 6 tilt events in the same location (East of the lease line and North east of the chevron well 20 sump expression ) since April 1st and corresponding Chevron Well 20 sump increased flow events. Chevron: 1 above reservoir tilt event (#06/29A, depth at 255 ft, south west of the sump expression) in Chevron property during the reporting period. Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time. Event # 06/29A

3 Well 20 Sump Volumes (1/1/2014 – 7/5/2015) 6/29/15– 7/5/15 Date 15 day Avg. Volume pulled (bbls) Daily Volume pulled (bbls) 6/29/2015159107 6/30/2015154176 7/1/2015157286 7/2/2015166337 7/3/2015155130 7/4/2015175398 7/5/2015182252 Start/End of EO1016 Phase 3 TRC steam injection test Estimated start of TRC steaming as per EO1068 - TRC steaming per area of investigation map TRC Steaming during Phase 3 – Emergency Order 1016 TRC Steaming – Emergency Order 1068 * Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time.

4 Well 20 Sump area ( 7/1/2015) Visual Observations: No new seep locations on Chevron property. * Chevron is not steaming within 800’ of the Well 20 Sump Expression at this time. Chevron TRC

5 Chevron MWSS 21S Property Line and Well 20 Sump “21S Restricted Entry Area” Do not enter red outlined area without approved safety plan N Outline of restricted area 22S TRC 21S CVX Photo 2 March 2015 Red outlined area should not be entered without approval of the Chevron 21S Diatomite OS. Site specific safe work plans must be developed and approved prior to entry. Well 20 Sump Expression Area 21S Property Line (dashed line) & Unstable Bank Area Due to the instability of the embankment between Chevron and TRC properties, Chevron has extended the Do Not Enter Area (“21S Restricted Area”) to include the area from the embankment to the flow lines that run west of Chevron wells H225 and 204R. The K- rails no longer define the Do Not Enter Area and will be removed. This area is outlined in red on the aerial photo. Chevron requests that no one enters the red outlined area without contacting the Chevron Operations Supervisor and developing a written safe work plan prior to entry. The Chevron Supervisor can be contacted at 661-768-8032. Chevron will work with the DOGGR to safely obtain photos or other data in this area if access to this area is required.

6 The Embankment Can be Stabilized 6

7 Concern for TRC Recent and Future Stabilization Efforts No communication by TRC with Chevron regarding excavation plans April 12, 2015 TRC report has drawings of a sheet piling system to be built on Chevron property without seeking Chevron’s permission or consultation June 22-26, 2015 TRC backfilled the embankment, created a shear wall, undercut the embankment without regard for proper engineering, and without DOGGR approval 7

8 Concerns Over Recent TRC Embankment “Fill” Efforts June 20, 2015June 24, 2015 TRC conducted excavation work between June 23 and 26, 2015 at the TRC Bull 31R expression Removed wet soil, added a rock base Pushed dirt up the embankment and wheel rolled for compaction with a front end loader and excavator Expression on the south side of TRC’s embankment increased and there is new pooling Further illustration of TRC trespass and improper excavation creating unstable conditions and increasing the flow of surrounding expressions June 26, 2015 8

9 TRC Embankment Work June 26, 2015 Note proximity of Well H225 to failing edge of the TRC embankment 9

10 TRC Embankment Work June 29, 2015 June 29, 2015 1200 hrs June 29, 2015 Issues of Concern Excavated a vertical wall Created areas of undercut with respect to the top of the embankment Illustrates further destabilization of the embankment by TRC TRC’s make shift retaining wall anticipates further collapse 10

11 Impact on Chevron Impedes resolution of DOGGR emergency orders Cannot access 2 operating wells due to TRC created safety concerns TRC excavation trespassed onto Chevron property 11


Download ppt "MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015."