Presentation is loading. Please wait.

Presentation is loading. Please wait.

RQ-21A Chit Management System RQ-21A FST Logistics Lead

Similar presentations


Presentation on theme: "RQ-21A Chit Management System RQ-21A FST Logistics Lead"— Presentation transcript:

1 RQ-21A Chit Management System RQ-21A FST Logistics Lead
Kevin Parsons RQ-21A FST Logistics Lead (252)

2 CMS Syllabus / Outline Gaining Access and Login Initiating a Chit Flow Chart and Routing CMS Search Options Assigning Task / Closing a Chit Summary

3 Chit Management System (CMS)
These tutorials are automated and will walk the user, keystroke-by-keystroke, through the processes of registering and logging in for the first time.

4 Request Access Link

5 Contact Application Administrators Link

6 First Login (after approval)
Once the administrator has approved your Account, you will receive an with the user Name you created (highlighted in red) and a Temporary password (highlighted in yellow) which you will be prompted to change the first time you log in. Open the RQ-21A Chit system by clicking the “click here” Link and login with the provided information. Click to continue

7 CMS Main Page Use this link to add a NEW chit.

8 Initiating a New Chit

9 LESPMR Chit Routing FST APML Squadron Prime Contractors MALS (Group)
Field Activities MAW (Wing) FST COMNAVAIRFOR (TYCOM) APML

10 CMS Search Options From this “LESPMR” drop-down menu, user has ability to Search Chit & Task Status, Advanced Search capability and Chit Print functions.

11 CMS Search Options (cont’d)
Pending – waiting on FST POC approval Proposed – waiting on APML approval Open – has APML approval and is “in work” Proposed Closed – all tasks are completed and assignee has proposed closure Closed – closure approved by APML Rejected - once rejected, no longer a viable chit

12 How to Search for Overdue Tasks for your IPT
Go to “LESPMR”, and select “Advanced Search” from the dropdown menu Highlight IPT Change to ‘Yes’ And search

13 How to Search for Proposed Closed Tasks for your IPT
Go to “LESPMR”, and select “Advanced Search” from the dropdown menu This is ‘N/A’ Choose ‘Proposed Closed’ from the dropdown menu And Search Choose your IPT

14 Adding a Task to a Chit Click “Add” to complete
Assign ‘Due Date’, ‘Priority’, ‘IPT’ Task is assigned to, ‘Assignee’ by name, ‘WMS Task ID’ if known and ‘Description’ of task to be completed Attach any files as applicable

15 Request to Close a Chit Chit Options Section allows for viewing of ‘Chit History’, to ‘Print Chit’ or ‘Request to Close’. Select ‘Request to Close’ to start closure option

16 Finalizing Request to Close Chit
Summary of actions: is a required field Attach any files as applicable Click “Request to close” to complete

17 Chit Management System Summary
How to Gain Access and Login How to Initiate a Chit Flow Chart and Routing What the CMS Search Options are How to Assign Task / Propose Closure of a Chit

18 QUESTIONS?


Download ppt "RQ-21A Chit Management System RQ-21A FST Logistics Lead"

Similar presentations


Ads by Google