Guarantees of Origin Scheme 30 th November 2011
2
2 Guarantees of Origin – a brief history EU Directive 2001/77/EC - first mentioned GOs Replaced by the Renewable Energy Directive 2009/28/EC Legislation transposed on the 28 th of March 2011 S.I. (Statutory Instrument) 147 of 2011 SEMO named as the Issuing Body for Ireland CER tasked with developing the Supervisory Framework
3
3 What is a Guarantee of Origin? “Guarantees of origin issued for the purpose of this Directive have the sole function of proving to a final customer that a given share or quantity of energy was produced from renewable sources.” - Section (52), DIRECTIVE 2009/28/EC OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL of 23 April 2009
4
4 Renewables Directive The sole purpose of GOs is Fuel Mix Disclosure There is no connection between national targets and FMD GOs do not follow the physical flow of energy
5
5 What is a Guarantee of Origin? Standard size of one megawatt hour (1MWh) Issued on request of the Generator Guarantee that electricity has been produced from a renewable source
6
6 Guarantee of Origin – Renewable Sources Examples of renewable sources: Wind Solar Ocean Energy Biomass Hydropower Landfill Gas Aerothermal Geothermal Hydrothermal
7
7 Fuel Mix Disclosure – Interim Solution SEMO completes the calc on an annual basis All Island Fuel Mix Suppliers submit declarations and ‘claim’ generation (Both in-market and out-of-market) Interim solution for 2008, 2009, 2010 For these years FMD was based on physical flows
8
8 FMD 2010 Breakdown
9
9 Fuel Mix Disclosure – Output SEMO provides an individual Fuel mix breakdown to Suppliers And All Island Mix breakdown Display on their customers’ bills Consumers may use this comparison when deciding which supplier to choose
10
10 Fuel Mix Disclosure – Enduring Solution Enduring solution to be in place next year for 2011 calculation Next year Suppliers will be able to declare Irish GOs GOs do not follow physical flow Deadline for Supplier Submissions for Disclosure Period 2011 is the 31 st March 2012
11
11 Guarantee of Origin - Status Used Deemed to be used in a disclosure period in which the GO is counted for FMD purposes A GO can only be used once Active 12 months from the date of production Can be used in any disclosure period in which it is active e.g. a GO issued on 1 st of June 2012 can be used in FMD 2012 or FMD 2013
12
12 Guarantee of Origin - Status Expired Expires after 12 months Can still be used or transferred after expiration Cancelled When used in FMD If not used in final FMD Disclosure Period, into Residual Mix Cancelled GOs cannot be used or transferred again
13
13 GO Scheme – Business Processes SEMO will administer the following processes: Registration Request Issuing Transfer Import Revocation
14
14 GO Scheme – Business Processes
15
15 GO Calendar Some processes are ad hoc Others are quarterly QuarterEnd Date Quarter 131 st March Quarter 230 th June Quarter 330 th September Quarter 431 st December
16
16 GO Registration Download from the SEM-O website Pack for Generators, Pack for Suppliers ‘Enable Macro’ document available on the website Pack must be fully completed
17
17 SEMO Website - GOs
18
18 GO Registration – Authorised Users Nomination of Authorised User (Internal) Nomination of External Agent (External) Can only have either an internal or external authorised user to Request, Issue, Transfer Supplier can act as an External Agent Password provided must be 8 characters Authorised Users and Passwords will be logged
19
19 GO Registration Once completed email to guaranteesoforigin@sem-o.com Acknowledgement email with Ref Number will be sent
20
20 GO Registration Within SEM Generators – details checked internally Out of SEM Generators – details checked with DSO Suppliers – details checked internally
21
21 GO Registration ID will be issued, this is separate to any market IDs This ID will be used for all correspondence relating to GOs and FMD Central registry will contain these IDs SEMO asks if participants can confirm receipt of this ID
22
22 GO Registration Request Submit Registration Pack Receive Input Information Check Registration Pack for completeness Validate Verify business details Verify Within-SEM Generator details Verify Supplier Unit details Contact DSO for necessary verifications Contact Participant Record Enter Participant details to GO registry Issue FMD IDs
23
23 GO Registration Enduring Registration Process will take 21 Working Days to complete Need to have Initial Registrations complete by the end of 2011 19 Working Days until Xmas!!!
24
24 GO Requests Ad Hoc process Generator sends request, receives Ref Number Two validation checks 1) Is the Generator registered for the scheme? 2) Are template details correct? 2 WDs for this validation Except for 10 WDs before end of quarter, extended to 5 WDs
25
25 GO Requests Requests can be for more than 1MWh, varying Start/End dates Verified Requests added to the request log Invalid Requests rejected SEMO will be backdating GOs for 2011 Start sending in requests once registered for the scheme
26
26 GO Requests Request Submit GO Request Send Acknowledgement Verify Check user details Check Generator details Record Update request log
27
27 GO Issuing Quarterly process Metered Generation (MG) pulled from SEM Market Systems (within market) and requested from MRSO (out of market) 10 Working Days after end of quarter
28
28 GO Issuing Cross check Requests against MG a) If Requested MWh <= MG – GOs Issued b) If Requested MWh > MG – GOs Rejected e.g. Request MWh = 10 MG MWh = 9 Authorised User will be informed that 9 are available Request can be resubmitted with revised values Resent within 2 WDs
29
29 GO Issuing Electronic document as per the S.I. Each certificate has its own unique ID Certificates emailed to the Authorised User (20 WDs after the end of the quarter) Authorised User calls SEMO with their password The file password is then given Password is randomly generated Certificates can then be accessed
30
30 GO Issuing – Format of a GO Will be in XML format
31
31 Issue GO Certificates Request Request MRSO data Extract Market Systems data Consolidate data Verify Upload request log Validate requests Communicate Send rejection Issue Update GO database Issue GO certificates
32
32 GO Transfer Ad hoc process (need to be completed by 31 st of March 2012 for 2011 FMD) Current holder’s Authorised User sends in a Transfer Request Details of the New Holder (GO Participant) SEMO verifies the details and updates the Central Registry New updated certificates sent to New Holder
33
33 GO Transfer
34
34 GO Transfer - Exports Export transfers are included here – need MS New certificates not sent on – registry updated as ‘Exported’
35
35 GO Transfers Request Receive Input Information Check user details Verify Check GO details Check account details Record Update database Contact export Member State Communicate Send rejection Send confirmation
36
36 Renewables Attributes Transfer Quarterly process Supplier advises which Generators they have PSO PPA agreements with SEMO will be checking PSO lists However, need as much info as possible Attributes will be assigned automatically every quarter If details change, must advise SEMO
37
37 GO Revocation Ad hoc – Only where SEMO have grounds to suspect fraud; rules set out in S.I. SEMO will advise the CER of concerns, however final decision will be taken by SEMO Post notice to current holder – must be written notice as per S.I. Previous holders will be advised, if contact details are available Update Central Registry with ‘Revoked’
38
38 GO Revocation Contact CERContact ParticipantUpdate Database
39
39 GO Imports Ad hoc process Advise SEMO ASAP – will need to contact Member States to verify validity If no response from MS after 10 WDs - rejected Minimum details required – Static Data SEMO will work on building contacts within Member States
40
40 GO Imports Receive Notice Contact Member State Update Database Send Confirmation
41
41 Conclusions Registration process to be completed Requests accepted ad hoc Issuing once per quarter Transfers accepted ad hoc Imports accepted ad hoc Revocation – as required
42
42 Next Steps Registrations to commence asap Once registered send through requests Backdating to commence for 2011 in January FMD MOST to be held in January – All Island
43
43 Next Steps
44
44 Q&A Thank you for your attention!