1 Programming in BIM environment 1

2 4DBIM, Construction Programme
Construction Sequence simulation using Navisworks Taija Puolitaival, Department of Construction, Unitec

3 BIM dimensions (BIMporn, 2013)
Taija Puolitaival, Department of Construction, Unitec

4 Quantity take –off Quantity take-off from 2D paper documents
PDF AutoCAD BIM (part of 5D BIM) Many software options Quantity take-off options inside the software Taija Puolitaival, Department of Construction, Unitec

5 Programming steps Determine the work activities = WBS
Determine activities duration (Quantities + Rawlinsons) Determine activities relationships = dependencies & lags Finish to Start Start to Start Start to Finish Review and analyse the programme Cost/resource allocation Resource levelling Implement the programme Monitor and control the programme Revise the database and record feedback Taija Puolitaival, Department of Construction, Unitec 2014 (adapted from Mubarak 2010)

6 WBS / Programme Distinction
Comprehensive classification of project scope Contains no activity duration No resource assignments No dependencies Programme Actual work to be done (only the activities on the last level of the WBS) Contains activity durations Contains assignment of resources to activities Contains dependencies Taija Puolitaival, Department of Construction, Unitec 2014

7 Quantity Take-off Construction manager’s point of view
- order of the activities - right size activities  how to build the building vs. Quantity surveyor’s point of view - what is the total amount of quantities  how much does it cost to build the building Taija Puolitaival, Department of Construction, Unitec 2014

8 determining of work activities things to be considered
Nature of the work/homogeneity Location/floor Size/duration Timing/chronology Responsibility Others = programmer’s mentality in breaking down the project Taija Puolitaival, Department of Construction, Unitec 2014 (Mubarak 2010)

9 References BIMporn (March 25, 2013). [Web log]. Retrieved from DSG Quantity Surveyors (2013). DSG Quantity Take 0ff - Tutorial [Video]. Retrieved from Mubarak, S. (2010). Scheduling and control (2nd ed.). Hoboken, New Jersey: John Wiley & Sons Patterson, G. (2009). Autodesk QTO #2 Working With .pdf Files [Video]. Ideate Inc. Retrieved from Sell, C. (2013). CM492 - Autodesk Quantity Takeoff 2013 [Video]. Retrieved from Taija Puolitaival, Department of Construction, Unitec 2014