Download presentation
Presentation is loading. Please wait.
Published byDamian Norton Modified over 9 years ago
1
GEORGIA SOLAR ENERGY ASSOCIATION’S 2013 SOLAR SUMMIT September 19, 2013 GEORGIA WATER WITHDRAWAL AND CONSUMPTION FOR ELECTRICITY GENERATION John Gornall, Esq. ARNALL GOLDEN GREGORY LLP 171 17 th Street, NW, Suite 2100 Atlanta, Georgia 30363 404.873.8650 john.gornall@agg.com 5932401v1
2
2 GEORGIA POWER WATER WITHDRAWN AND CONSUMED: 2008-2012 2012 Water Withdrawn/Consumed Source: Georgia Power Company Voluntary annual reports to GA EPD.
3
3 2011 Water Withdrawn/Consumed Source: Georgia Power Company Voluntary annual reports to GA EPD.
4
4 2010 Water Withdrawn/Consumed Source: Georgia Power Company Voluntary annual reports to GA EPD.
5
5 2009 Water Withdrawn/Consumed Source: Georgia Power Company Voluntary annual reports to GA EPD.
6
6 2008 Water Withdrawn/Consumed Source: Georgia Power Company Voluntary annual reports to GA EPD.
7
7 Withdrawn (MDischarged (MConsumed (M Percentage Consumed (Cooling Tower) Capacity Factor Evap. Potential Combine Cycle Capacity Factor 2012 Hammond280000000 Kraft190000000 McManus2.5000000 Mitchell8000000 Plant Bowen290.014.550000 Plant Branch480010000 Plant Franklin4.913.980000 Plant McDonough7.80.05.976000 Plant McIntosh5205.9110084.2 Plant Scherer5002856000 Plant Wansley4201638000 Plant Yates2705.320000 Plant Hatch6103659000 Plant Vogtle6504366000 Total1,299.20159.512% Which plants will be decommissioned? Source: Georgia Power Company Annual voluntary reports to GA EPD
8
8 Southern Company: Water Withdrawn/Consumed 2008-2012 Source: Southern Company 2013 Water Action Report http://www.southerncompany.com/what-doing/pdf/Water_Action_Report.pdf
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.