Presentation is loading. Please wait.

Presentation is loading. Please wait.

Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3.

Similar presentations


Presentation on theme: "Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3."— Presentation transcript:

1 Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3

2 Previous Week Prototype Plan of Action

3 Week 4 - Planned –Shock Connect –Lower Arm –Upper Arm

4 Fabrication Punch list

5 Materials List Completed Parts –BOTTOM BRACKET AND HEAD TUBE 1-5/8 OD X 1-1/4 ID X 7-1/2 LENGTH - 1026 TUBE –ARMLINK ¾ X 1 X 24 RECTANGULAR BAR - Aluminum –TOP TUBE, BOTTOM TUBE, SEAT TUBE 1 ½ OD X 1/16 THICKNESS X 72 –Axle MOUNT Steel or Aluminum Plate: Size to be determined –Arm LINK 3 ½ X 6 3/8 X - Aluminum In Progress Parts –LOWER ARM Steel Round Tubing, Steel Plate, 1” x ½” Steel Rectangular tube –Upper Arm 1” x ½” Steel Rectangular tube.

6 Bike Model

7 Website http://www.prism.gatech.edu/~mefach11

8 Next Week Prototype Review


Download ppt "Unit 91 Week 14 Jon Gutierrez, Chris Sauer, Simon Radomski, Chat Huynh, Jeff Burton, & Robert Platt November 19, 2008 Prototype Review Week 3."

Similar presentations


Ads by Google