Download presentation
Presentation is loading. Please wait.
Published byAbel Ellis Modified over 9 years ago
1
Syntax and Methodology Issues Chris Hassler Kevin Smith
2
Issues Confronting CEFACT Lack of CCMA Business Information Masters (BIMs) Lack of UCM Issues with Schema Generation Coordination between PGs
3
CCMA Project has been in progress for over three years now Current document is contains too much and does not satisfy business needs User Guide does satisfy business needs, but is not accepted by ICG or ATG as an approved specification
4
BIMs Draft paper written by Michael Dill Provides a way to create overall business information concepts Can be restricted down to business messages Idea arose due to lack of CCMA standard Lack of CCMA is forcing TBG to come up with its own solutions
5
UCM There do not appear to currently be any plans to develop UCM for CCTS 2.01 There is a context section within CCTS 2.01 They may consider that to be all CCTS 2.01 needs – it is unclear from the project documentation All UCM development appears to be for CCTS 3.0
6
Coordination with PGs Other PGs do not seem to be responding to TBG needs Two underlying issues Lack of resources Misaligned priorities
7
Discussion
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.