International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,

Similar presentations


Presentation on theme: "International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,"— Presentation transcript:

1 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI 1.Introduction  Submission of Proposal  EU contract 2.Scientific and technical scope of Design Study (DS) 3.Participating institutes / distribution of work and financial resources 4.Management of DS 5.Signing of documents and next steps 6.Agenda of the meeting

2 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Calls: 4.3.2004, Budget 70 Mio € (122 applications, 5 times overbooked) Call 2005 canceled (budget transferred to 1. Call), Call 2006 ? FAIR applications: Design Study "DIRACsecondary-Beams": (Feb. 2005 - Jan. 2008) application to EU: 10 Mio€ ( 9 Mio€ approved, total budget ~ 22 Mio€ ) Construction of new infrastructure "DIRAC-PHASE-1": (mid 2005 – mid 2009) application to EU: 14,8 Mio€ ( 10,4 Mio€ approved) EU funding 100% for Construction (up to 10% of total construction cost) EU Support for Research Infrastructures in FP6 "Design Studies" and "Construction of new infrastructures"

3 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR History of the Design Study Proposal: mid 2003: Start preparation of proposal 4.3.2004: Submission of proposal 9.8.2004: Start of contract negotiations Feb. 2005: completion of contract negotiations 17.3.2005: signing of EU contract by Coordinator GSI  Start of contract 1. February 2005 (duration 36 month)

4 Primary Beams 10 12 /s; 1.5-2 GeV/u; 238 U 28+ Factor 100-1000 over present intensity 4(2)x10 13 /s 30 GeV protons 10 10 /s 238 U 73+ up to 35 GeV/u Secondary Beams Broad range of radioactive beams up to 1.5 - 2 GeV/u; up to a factor 10 000 in intensity over present Antiprotons 3(0) - 30 GeV Storage and Cooler Rings Radioactive beams e – A(RIB) collider 10 11 stored and cooled 3(0) – 15 GeV antiprotons Cooled beams Rapidly cycling superconducting magnets Key Technical Features UNILAC ESR GSI Accelerator Facilities Future Accelerator Facilities SIS100 /SIS300 Plasma Physics CBM HESR NESR Super- FRS CR Atomic Physics PANDA FAIR NUSTAR Scope of Design Study:  secondary beams (RIB and Antiprotons)

5 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Tasks

6 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Tasks

7 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Participants 33 participating institute (31 contractors)

8 Total eligible costs (Total budget and EC contribution for each task)

9 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR

10 Management Structure Design Study "DIRACsecondary-Beams" EC Design Study Coordinator Management Office Steering Committee (Design Study Coordinator, FAIR Project Leader, GSI Director, Representatives of the 5 Design Projects) Design Project PANDA 1 Coordinator / 4 Task Leaders / 16 Participating Institutes Design Project NUSTAR 1 Coordinator / 5 Task Leaders / 10 Participating Institutes Design Project HESR 1 Coordinator / 4 Task Leaders / 3 Participating Institutes Design Project COOLSB 1 Coordinator / 2 Task Leaders / 2 Participating Institutes Design Project SIS100 1 Coordinator / 6 Task Leaders / 12 Participating Institutes Governing Board (representatives of 33 Institutes/Institutions) Advisory Boards  existing PACs and TAC of FAIR project Design Study Technical Group ( Design Study Coordinator, 5 Design Project Coordinators and 21 Task Leaders )

11 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Management Design Study: Design Study Coordinator: Jürgen Eschke, GSI Head Management Office: Thomas Beier, GSI Management Office: NN, GSI Consortium Agreement: Katharina Berghöfer

12 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Design Project Leader: 1. PANDA: James Ritman (FZJ) 2. NUSTAR: Martin Winkler (GSI) 3. HESR: Raimund Tölle (FZJ) 4. COOLSB: Markus Steck (GSI) 5. SIS100: Peter Spiller (GSI)

13 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Steering Committee Tasks of the Steering Committee The Steering Committee assists the Design Study Coordinator and is responsible for the operation of the whole Project as a homogenous body.... The Steering Committee’s tasks are: Review of resource status and Project progress Preparation on major changes in the implementation plan including re-distribution of the budget, to be approved by the Governing Board Monitoring of scientific and technical progress (improve quality of reports) Composition of the Steering Committee The Steering Committee is composed of: -The Design Study Coordinator as the Chairperson -The FAIR Project Leader -The GSI Director -One representative of each of the five Design Projects J. Eschke (Chair), H. Gutbrod, W. Henning, PANDA (Paola Gianotti, Frascati), NUSTAR (R. Krücken, München), HESR (R. Maier, FZJ), COOLSB (B. Franzke, GSI), SIS100 (H. Eickhoff, GSI)

14 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR Signing of documents At the meeting of the Governing Board the representatives of the participating institutes will receive: a.) a copy of the EU contract b.) 3 signed accession froms (to the contract) c.) a signature page for the consortium agreement. These documents should be signed within 2 weeks and returned to the coordinator until the end of April! The Description of Work (Annex I to the contract) and the final version of the consortium agreement will be distributed by e-mail!

15 International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15, 2005 J. Eschke, GSI DIRAC secondary beams – EU Design Study for FAIR  Start of contract 1. February 2005 (duration 36 months) EC financial contribution for all contractors will be transferred to the coordinator GSI (Article 8). The pre-financing for the first 18 months of the contract will be 3.96 Mio € (44% of 9 Mio €).  GSI will transfer the 44% of the EC contribution to each contractor.

16


Download ppt "International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt Introduction and Status EU Design Study Kick-off meeting April 14-15,"