1 Poverty is easy to recognize but difficult to define. “Characteristics of being poor” "They are invisible and excluded from society, often deformed or in pain, without hope, unwanted, totally dependent, and vulnerable. It is a chasm into which many fall. Its width and depth, defining the chances of falling in and getting out again, depend on the wealth of the country and its will to distribute it. Like the circles of hell, there are many levels". Volkmann

2 Sl. No. Item of ActivityDate 1.State level training at Bhubaneswar for PD, DRDA, APD(admin), District Statistical Officer 13 th Oct’09 2.Meeting of Collectors16 th Oct’09 3.Training at District Level23 rd or 24 th Oct’09(Either of the day) 4.Block level trainings at each block headquarters28 th, 29 th, 30 th, 31 st Oct’09(any one day to be decided by the Collector) 5.Special Meeting of PRIs at ZP/ PS and GP levelBetween 1 st to 5 th Nov’09 (To be decided by the Collector) 6.Display of detailed list (L-30 form), photography and recording of biometric identification of the head of HH of each HH in the GP office 15 th to 30 th Nov’09 7.Conduct of validation in each village (house-to- house) and subsequent cross-checking 1 st Dec to 15 th Dec’09 8.Data validation and entry of new HHTo be completed by 30 th Dec’09 9.Special PallisabhaAny day between 1 st to 15 th Jan’10 10Preparation of final list and web-hosting31 st Jan’10 Calendar of Events – VALIDATION OF BPL 2002 SURVEY LIST

3 V ALIDATION OF BPL 2002 SURVEY LIST L-30 L-30 forms will be displayed in the G P Office from 15 th November 2009 to 30 th November 2009 BPL facilitator will explain about the validation process, calendar and HH score. Verifying Officer would visit house-to-house for validation /inclusion of new household using blank L-00 forms and L-30 forms for reference. L-00 Verifying Officer will write the five digit Family ID (in case of existing household in BPL 2002 Survey list) or last Family ID of that village/ 01, 02, 03, …,0n (in case of new household) on the wall/ door of the house of each HH by using a brick colored chalk.

4 V ALIDATION OF BPL 2002 SURVEY LIST (C ONTD..) Scheduled Tribes including the Primitive Tribal Groups, Scheduled Castes, Women headed households, daily wage earners, families having disabled child/ children and persons with HIV/AIDS will get due priority during the validation / inclusion process. Concurrently, the Supervisory Verifying Officer will randomly crosscheck 15% HHs already verified by the Verifying Officer. SVO cannot include any new data or make any correction in the validation forms (L-00) submitted by the Verifying Officer.

5 V ALIDATION OF BPL 2002 SURVEY LIST (C ONTD..) In case of large-scale discrepancy reported by the SVO, the BDO can recommend for re-verification of the some/ entire village. Collector may issue order for re-verification through another Verifying Officer. After data entry, village-wise list of family details with name of the head of HH, social category and total score obtained will be generated ( L-60 forms ) (ST-first, SC- second and Other Caste-third). L-60 forms HHs from each village will be ranked in the descending order of poverty (i.e. the ascending order of scores) in the list (L-60 forms). L-60 forms will be placed in Pallisabha for ratification

6 PRINTING OF FORMS L-00 forms (Blank Application forms), Instructions to fill up the forms will be printed locally at District Hqrs. L-30 forms will be printed from the CD/ website either at DRDA or Block office. L-60 forms will be printed from the website at Block office after completion of data entry. All forms should be in A-4 size.

7 B UDGET Cost of printing per form :Rs.0.40p (maximum) Remuneration per HH:Rs.1.00p (fixed) Remuneration for Supervision per HH:Rs.0.50p (fixed) Data entry per HH:Rs.0.50p (fixed) Training cost per participant per day:Rs.50/- (fixed) Mobility & P.O.L per District:Rs.25,000/- Contingency/Misc. per District:Rs.1.00 lakh I.E.C costper GP: Rs.1000/- Total Requirement for the State is Rs. 292.50 lakhs (approximately)

8 Families Surveyed – BPL Survey Household List 2002. SL No.District Name No. of Block No. of GP No. of Village No. of Families Surveyed STSCOthTotal 1ANUGUL820919042955941651153735224945 2BALANGIR1428517838398768650204944357581 3BALESHWAR1228930094375380276255573379602 4BARGARH1224812086643463859186628316921 5BHADRAK71931359545158682193880258013 6BOUDH363119012532229115811893561 7CUTTACK1434219642020789246306799416252 8DEOGARH36080518551116772901459242 9DHENKANAL819910593266047844153141233645 10GAJAPATI71291551624831263443237118354 11GANJAM22475303029690131130468904629724 12JAGATSINGHAPUR81941293178954922192437249148 13JAJAPUR1028018133403788067243132365236 14JHARSUGUDA57835231237176443118880069 15KALAHANDI13273222110112670027172358343511 16KANDHAMAL121532534804743581436748153036 17KENDRAPARA92301542272652974220089275789 18KENDUJHAR13286208612111655750123222300088 19KHORDHA1016815771638944788197142258319 20KORAPUT1422619061555594782576782280166 21MALKANGIRI7108895677233078419193117700 22MAYURBHANJ26382393025505185372175657516080 23NABARANGAPUR101698941348694405767153246079 24NAYAGARH817916911391932717165300211936 25NUAPADA5109652488422220769044140093 26PURI112301705265760853245855309365 27RAYAGADA1117127181078083612246738190668 28SAMBALPUR91481284565975067763831171105 29SONEPUR696975126712908473584115339 30SUNDARGARH1726217202021394307683782328997 Total3146234506501852036153132043572087740564

9 DISTRICT-WISE INFORMATION ON BPL CENSUS Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census 2001 HH@ 5 personBPL 2002 BOUDH 667765414589617718723730387460893561 GAJAPATI 874548247811202968763518448103690118564 GANJAM 4527323404355483083015853136937627387629841 KALAHANDI 2412942069613078351930541334372266874343511 KORAPUT 1881691629312647072218461177954235591280166 MALKANGIRI 79865677371088708913848023296046116586 NABARANGP UR 1518341375042154291586841018171203634246080 NAWAPARA 940397865212702299465530524106105140093 KANDHAMAL 113741100802145335113970647912129582153036 RAYAGADA 141862122061188499135785823019164604190764 SD16177661353706210765114541621004060720081212312202

10 DISTRICT-WISE INFORMATION ON BPL CENSUS (Contd..) Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census 2001 HH@ 5 personBPL 2002 ANGUL 1832371263432031521205811139341227868224983 BALANGIR 2389681811953297002013101332249266450357583 BARGARH 2109711470272919011762411345601269120316921 DEBAGARH 482373383355298435712740955481959242 DHENKANAL 1631681376702030321271591065983213197233645 JHARSUGUDA 5843934158681643341550905610181180069 KEONJHAR 2116111755332869232208201561521312304300089 SAMBALPUR 1372869915515079990141928889185778171105 SONEPUR 919095725011009880396540659108132115339 SUNDERGARH 2256961676222851411859691829412365882328997 ND15695221159786198420812796031052680621053612187973

11 DISTRICT-WISE INFORMATION ON BPL CENSUS (contd..) Name of the District 1992 SURVEY1997 SURVEYBPL 2002 SURVEY Total Rural Families NO. OF BPL FAMILIES Total Rural Families NO. OF BPL FAMILIES Census 2001 HH@ 5 personBPL 2002 BALASORE 3140082640883494462576062023056404611379598 BHADRAK 1993231791302051851368491332249266450258128 CUTTACK 2532931877833359981760022340686468137416251 JAGATSINGHPU R 161946108827172300908951056556211311250929 JAJPUR 2521381798382807691695951622868324574365236 KENDRAPARA 1887681169902194361314241301856260371278657 KHURDA 1844841428502268001341921874405374881257736 MAYURBHANJ 3638693150844821763748672221782444356516080 NAYAGARH 152455132219183437124576863934172787213101 PURI 2078871552792367211636391498604299721309365 CD22781711782088269226817596451613599632271993245081 TOTAL54654594295580678412744934103670340973406827745256 ND 15695221159786198420812796031052680621053612187973 CD 22781711782088269226817596451613599632271993245081 SD 16177661353706210765114541621004060720081212312202

12 2009-10(Sept. 09) Performance of Districts under

13 ORISSA

14 Yearwise TFA and Expenditure under NREGS(Orissa): 2005-06 to 2009-10 (upto Sept. 09)

15 O RISSA Strengths 85% wage disbursement through accounts 100% MIS operationalisation Concerns: Overall decline in HHs provided employment: 18% Districts with low persondays per households (less than 20): Kalahandi (19%), Sundergarh (17%), Phase III districts except Cuttack (average 16%). Low work completion rate: Only 2.8% for the State 60:40 wage-material ratio not maintained: Jharsuguda (30%), Kalahandi (53%), Nawarangapur (49%), Nuapada (41%), Sambalpur (48%) and Bhadrak (45%) Avg. wages paid higher than Notified wage: State Average is Rs.92.04 – 22 districts Less than 50% wage disbursement through accounts: Boudh (10%), Malkangiri (9%), Jagatsingpur (42%) and Khordha (0%)

16 O RISSA New Initiatives Gaon Saathi for each village GRS for each GP GPTA for each Block Gram Rojgar Sanjojak-cum-Mate for each work now-weekly payment SBI-Business Correspondent for each GP for onsite payment Computers now even at GP level Training of 25000 PRIs for demand generation Social Audit at 5000 GP in 2009 Opportunities Overall decline in involvement of DPCs Too small works and no visibility Rumour that agri-wages are up due to NREGA GoI may include CC Roads in ST/SC Basti and labour component of IAY Emphasis on convergence with agriculture,forest and water resources RTI and now Ombudsman who can lodge FIR against “delayed payment of wages

17 17 Improvements Wage rate of earth work in Orissa & AP for 126cum earth work PWD Rs 3701/ NREGA-Orissa Rs 4542 NREGA AP Rs14175/ Opportunities for convergence Sept 2009 DepartmentFundexp UC Water Resource 18.22cr6.25cr 1.62cr Forest18.19cr9.18cr3.38cr Agriculture46.89cr33.35cr7.41cr Fisheries ARD0.77cr0.19crnil ST SC Deptt3.13cr2.07cr0.88cr H & Textile4.37cr3.40cr0.57cr RD0.99cr0.64cr0.63cr Works0.94cr0.68cr0.50cr Total93.53cr55.77cr15.02cr NREGA576.67cr215.13cr

18 SGSY

19 Achievement under SGSY Year Total number of swarozgaris assisted Credit Mobilised (Rs. in crore) Target Achieve ment %Target Achieve ment % 2008-0910705110627199235.97209.9289.00 2009-1012452268175274.4811.784.29

20

21

22 1.Village Hatt: Better marketing facility - rural poor to sale their product though-out the year. Shopping platform - strengthen forward and backward linkage. Promotion of growth center-convergence and rural economy. Block Level Three Village hatts in each district -Rs.15 lakh per hatt. GoI share 1 st installment released to all DRDAs, DRDAs to 60% to claim 2 nd installment of Central Share. Collectors may go ahead with construction of Village Hatts as per GoI Guidelines. District Level; District to submit DPR for Hatt at the District headquarters - Rs.1.5 crore. Major Issues

23 2.Rural Self Employment Institute ( RSETI) Structure GoI to provide Rs. 1.00 crore one time grant for infrastructure. State Government to provide land free of cost to the Sponsoring Bank. Each RSETI to train to 70% BPL youth. Rs. 10.00 lakhs for period of 3 years can be provided for the rent MoRD to support recurring cost of training(maximum Rs. 4, 000/-). Issues with Collectors: Collectors should identify land/site and co-ordinate for setting-up RSETI. Land identification should be completed-31 st December, 2009. Committee under the Chairmanship of the Collector shall be constituted. PD DRDA. GMDIC. AGM of Lead Bank. AGM, NABARD. Director RSETI. Lead District Manager- Member Convener.

24 3. General Issues Meeting of BLCC/ DLCC on SGSY to held regularly. Basic Orientation Training to all Swarozagaries before Bank Loan. Collectors are authorized to undertake infrastructure project under SGSY with approval of the District SGSY Committee. 10 % of total allocation for swarozgaries of 2009-10. 10 % of total allocation for swarozgaries of previous years. No Infrastructure/Training Fund to create corpus fund for micro-finance /managing the SHG federations. Placement based skill development training programme. 4.Restructuring of SGSY to NRLM Focus on universal coverage of rural poor into SHGs. To be launched from 20010-11

25 DRDA Administration

26 Merger of DRDA Employees GoI emphasizing for absorption of DRDA employees in the line Department. DRDA employees be redeployed in Z P. On redeployment ZP, they can be deputed to DRDA Cell of Z P After absorption- GoI would sanction grant-in-aid 2010 -11. Other Issues Computer Programmers not to be transferred (Bhadrak and Rayagada Districts). Outsourced posts should be outsourced, should not be contractual. GRS vacancies be filled-up by with Civil Engineering background.

27 G RAM P ANCHAYAT A UTOMATION. Computer hardware and peripheral to be procured from NICSI for computerization of Gram Panchayats (one Laptop Computer and one Printer) out of Twelfth Finance Commission Grant. Two laptop computers to be procured for each Panchayat Samiti out of Twelfth Finance Commission grant.

28 RURAL HOUSING

29 RURAL HOUSING (IAY)  IAY scheme came into force since 1995-96 as an independent scheme and now a Flagship programme of Govt. of India under the banner of “BHARAT NIRMAN”. TARGET GROUPS  BPL households living in the rural areas belonging to SC/ST, freed bonded labours and non-SC/ST BPL normal households, widows and next of Kin to defence personnel /paramilitary forces killed in action residing in rural areas( irrespective of their income criteria) ex-service men and retired member of paramilitary forces fulfilling the other conditions.  60% of the target is meant for SC/ST and balance 40% is meant for non-SC/ST beneficiaries.  15% reservation for Minority Community.  3% reservation for physically and mentally challenged persons & the funding pattern is 75:25 between Central Govt. and State Govt.

30 SPECIAL PROVISION FOR NATURAL CALAMITY VICTIMS.  10% of the district’s annual target or Rs.70.00 lakhs (including State Share) whichever is higher during a financial year is earmarked for Natural Calamities. The district Administration is authorized to first incur the expenditure and extend assistance to the victims and submit the proposal to Govt. of India for reimbursement of the funds. SELECTION PROCEDURE. “Pallisabha”  The beneficiaries are selected by “Pallisabha” and the beneficiary has to construct the house himself/herself and no middle man is allowed.  The 5 years permanent wait list prepared on the basis of 1997 BPL Survey is the basis of beneficiary selection till date as the BPL list 2002 has not been finalised.  The eligibility of the potential beneficiaries must be checked by the Panchayat Executive Officers / Extension Officers (other than J.Es /GPTAs) before issuing work order.

31  The unit cost has been revised to Rs.35,000/- w.e.f 2008/09 per unit instead of Rs.25,000/-.  Funds will be released at 4 installments. 1 st installment...Rs. 5,000/- Alongwith work order. 2 nd installment...Rs. 10,000/- After completion of plinth level. 3 rd installment...Rs. 10,000/- After lintel level. 4 th installment…Rs. 10,000/- After roof casting/ laying  No deduction other than royalty and Rs.50/-( for Photo) shall be made than the Unit cost.]  RCC slab is not mandatory. Any type of fire proof roofing (RCC Slab /AC sheet /GCI sheet/Tiles) etc. is permissible.  Payment to beneficiaries shall be made through direct credit of funds to their individual savings Bank Account opened in the Banks /Post Offices.

32 2009-2010  The IAY(normal) target is 119649.  During 2008-09 Govt. of India have allocated 96066 nos. of houses as additional package and the same target will be taken into account in the year 2009-10, aggregating the total target to 215715.  An amount of Rs.19159.87 lakhs have been released to 28 Districts (except Jagatsinghpur and Kendrapada) by Govt. of India towards 1 st installment.  An amount of Rs. 7317.567 lakhs has been released towards the matching State Share till Sept,2009.  Upto Sept-2009, 14208 nos. of houses have been completed out of the last year’s spill over houses, 77379 nos. of houses are under progress.

33 2008-2009  An amount of Rs.10000.00 lakh has been provided in the BE for2008-09. An amount of Rs.9999.85 lakhs was sanctioned to the districts, as against the physical target of 28,571. 5000 houses have been provided to Kandhamal District as a special package.  216 nos. of houses have been completed by March,2009.  Expenditure till March,2009 is Rs.1140.29 lakhs.2009-2010.  An amount of Rs.6000.00 lakhs has been provided in the B.E for 2009-10 against a total target of 17142 nos. of houses. 5000 houses have been provided to Kandhamal District as a special package.  Expenditure upto Sept, 2009 is Rs.2506.76 lakhs as against previous year’s target and 2493 nos. of houses have been completed.  Rs. 5999.70 lakhs is being released. MO KUDIA

34 M AJOR I SSUES All the beneficiaries should have their SB account in Bank/ Post Office so that it will be easier to include all the information in the database. All work orders are to be issued immediately so as to facilitate for getting 2nd installment of Central Share. Eligible beneficiary having no homestead land, ear-marked fund of Govt. of India for purchase of land and allotment of the same to the eligible person be expedited. Jagatsinghpur district has not availed 2 nd installment of Central share for the year of 2008-09 as the district has not furnished proposal to Govt. of India. Kendrapara and Jagatsianghpur districts have not yet received 1 st installment of Central share during 2009-10. Kendrapara district has not yet complied the objections raised by Govt. of India. Should submit proposal to Govt. of India in the prescribed format to avail 1 st installment of funds for the year 2009-10.

35 BACKWARD REGION GRANT FUND (BRGF)

36 BACKWARD REGION GRANT FUND (BRGF) Convening District Planning Committee (DPC) for approval of Annual District Plan – 2009-10. Preparation of Annual District Plan – 2010-11 well in ahead by 25-12-2009 to enable GoI for release funds during 1 st week of April, 2010. Uploading of approved Annual District Plan for 2007-08 & 2008-09 in PlanPlus (Except Boudh, Bolangir, Malkangiri and Mayurbhanj). Proposal for BRGF Resource Centre at Block and GP level. Convergence with NREGA.

37 F INANCIAL & P HYSICAL A CHIEVEMENT UNDER DIFFERENT S CHEMES DURING 2009-10 ( UPTO S EPTEMBER 2009)

38 F INANCIAL & P HYSICAL A CHIEVEMENT UNDER DIFFERENT S CHEMES DURING 2009-10 ( UPTO S EPTEMBER '09) ORISSA Sl. No. SchemesFinancial (Rs.in Crore)Physical TFAExp%TargetAch%Unit 1NREGA576.66215.13370.00159.8 2 Lakh Mandays 2SGSY107.2121.432012452268175 No. of Swarozgaris 3I.AY ( Normal)320.1175.6124215715142087 No. of Houses 4I.AY ( Naxalite)34.4111.29332727914615 No. of Houses 5Mo Kudia88.6025.07282835524939 No. of Houses 612th FC325.8462.551913769780757 No. of Projects 7 BRGF 273.6592.903402691 No. of Projects 8 GGY 104.5715.601501063 TOTAL1831.06519.5928

39 ANGUL Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA 18.155.242903.52 Lakh Mandays 2SGSY 1.850.8043330646814 No. of Swarozgaris 3I.AY ( Normal) 6.902.433553562966 No. of Houses 4Mo Kudia 1.750.62365806311 No. of Houses 512th FC 11.312.672413611383 No. of Projects 6GGY 8.421.0713054 No. of Works

40 BOLANGIR Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA18.698.004304.70 Lakh Mandays 2SGSY4.730.3985483240 No. of Swarozgaris 3I.AY ( Normal) 8.610.931160523255 No. of Houses 4Mo Kudia 2.21 0.3817662203 No. of Houses 512th FC12.631.241070414521 No. of Projects 6BRGF14.216.39450.001880 No. of Projects

41 BALASORE Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA14.245.654003.07 Lakh Mandays 2SGSY7.350.0917217591 No. of Swarozgaris 3I.AY (Normal)-1.842.47-134167144152 No. of Houses 4Mo Kudia6.170.427182600 No. of Houses 512th FC 18.102.64 15 14871007 68 No. of Projects 6GGY 9.641.06 110 64 No. of Works

42 BARGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA16.715.103102.83 Lakh Mandays 2SGSY5.500.31649353587 No. of Swarozgaris 3I.AY (Normal)22.287.6634104074705 No. of Houses 4Mo Kudia3.701.15311137474 No. of Houses 512th FC 14.822.67 18 677274 40 No. of Projects 6GGY 8.960.43 5 12 No. of Works

43 BHADRAK Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA11.787.806604.44 Lakh Mandays 2SGSY1.570.5032323000 No. of Swarozgaris 3I.AY (Normal) 17.564.8227109663573 No. of Houses 4Mo Kudia3.590.0511198171 No. of Houses 512th FC 10.811.36 13 41485 21 No. of Projects 6GGY 8.491.49 18 32 No. of Works

44 BOUDH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA10.724.19 39 2.52 2 SGSY2.960.031201400 No. of Swarozgaris 3I.AY (Normal) 3.850.6517204425913 No. of Houses 4Mo Kudia0.700.101522300 No. of Houses 5 12th FC4.680.010194126 No. of Projects 6BRGF11.750.43 4 28 No. of Projects

45 CUTTACK Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA6.644.016003.99 Lakh Mandays 2SGSY4.811.5432476098321 No. of Swarozgari s 3I.AY (Normal) 28.827.0324137922802 No. of Houses 4Mo Kudia5.230.71141507191 No. of Houses 512th FC 24.972.52 10 395358 91 No. of Projects 6GGY 12.554.21 34 249 No. of Works

46 DEOGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA8.021.812301.12 Lakh Mandays 2SGSY0.750.2128120600 No. of Swarozgaris 3I.AY (Normal)3.261.3341201934517 No. of Houses 3aI.AY (Naxalite) 3.121.3844284629810 No. of Houses 4Mo Kudia0.770.03422100 No. of Houses 512th FC2.880.93321056360 No. of Projects 6 BRGF10.614.48 42 0125 No. of Projects

47 DHENKANAL Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA36.647.0919 6.54 Lakh Mandays 2SGSY3.340.000386500 No. of Swarozgaris 3I.AY (Normal) 8.000.6687104901 No. of Houses 4Mo Kudia0.810.182277671 No. of Houses 512th FC6.600.2445927613 No. of Projects 6 BRGF13.161.06 8 015 No. of Projects

48 GAJAPATI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA12.537.2258 6.68 Lakh Mandays 2SGSY1.140.383319081498 No. of Swarozgaris 3I.AY (Normal)3.910.3593229742 No. of Houses 3aI.AY (Naxalite) 4.210.2664330110 No. of Houses 4Mo Kudia1.200.22183433510 No. of Houses 512th FC8.821.9021240104 No. of Projects 6BRGF12.154.41 36 081 No. of Projects

49 GANJAM Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA31.6419.8463027.12 Lakh Mandays 2SGSY10.556.30608221187023 No. of Swarozgaris 3I.AY (Normal)24.011.0441750111437 No. of Houses 4Mo Kudia6.690.000191200 No. of Houses 512th FC16.100.00040100 No. of Projects 6 BRGF19.188.20 43 0165 No. of Projects

50 JAGATSINGHPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1 NREGA 5.782.71 47 0.001.76 Lakh Mandays 2SGSY1.170.322725331255 No. of Swarozgaris 3I.AY (Normal)12.162.331983094696 No. of Houses 4Mo Kudia3.180.00090800 No. of Houses 512th FC9.441.38151115852 No. of Projects 6GGY8.251.1414 141 No. of Works

51 JAJPUR Sl. No. SchemesFinancial (Rs.in Crore)Physical TFAExp%TargetAch%Unit 1NREGA37.839.392505.44 Lakh Mandays 2SGSY3.571.283647492385 No. of Swarozgaris 3I.AY Normal) 14.051.0881247010248 No. of Houses 4Mo Kudia3.380.40121363242 No. of Houses 5GGY 7.000.00 0 0 No. of Works 612th FC 17.365.21 30 711394 55 No. of Projects

52 JHARSUGUDA Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA11.586.2254 1.48 Lakh Mandays 2SGSY0.550.437884729234 No. of Swarozgaris 3I.AY ( Normal)2.441.0945191032517 No. of Houses 4Mo Kudia0.620.45722088641 No. of Houses 512th FC4.420.14316492 No. of Projects 6 BRGF11.233.47 31 0241 No. of Projects

53 KALAHANDI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA50.554.168 1.98 Lakh Mandays 2SGSY5.660.40754362334 No. of Swarozgaris 3I.AY (Normal)11.754.143561053676 No. of Houses 4Mo Kudia2.130.944466711818 No. of Houses 512th FC15.847.2446441943 No. of Projects 6 BRGF17.801.80 10 042 No. of Projects

54 KENDRAPARA Sl No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA1.531.01660.000.81 Lakh Mandays 2SGSY1.990.03234721123 No. of Swarozgaris 3I.AY ( Normal)2.990.58195604200 No. of Houses 4Mo Kudia2.140.09061200 No. of Houses 512th FC 14.444.39 30 16913680 No. of Projects 6GGY 12.371.40 11 90 No. of Works

55 KEONJHAR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA30.706.872204.27 Lakh Mandays 2SGSY6.080.52960282254 No. of Swarozgaris 3I.AY (Normal) 12.932.311870224546 No. of Houses 4Mo Kudia2.460.9438768203 No. of Houses 512th FC14.574.01282004925 No. of Projects 6 BRGF21.013.46 16 0169 No. of Projects

56 KHURDA Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA3.011.42470.001.20 Lakh Mandays 2SGSY2.290.52233701271 No. of Swarozgaris 3I.AY ( Normal) 26.153.00111152955620 No. of Houses 4Mo Kudia4.410.44101261292 No. of Houses 512th FC 8.851.30 15 542139 No. of Projects 6GGY 8.160.86 11 91 No. of Works

57 KORAPUT Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA46.7011.0324 7.57 Lakh Mandays 2SGSY7.031.402062772053 No. of Swarozgaris 3I.AY ( Normal)13.973.8027559562511 No. of Houses 4Mo Kudia2.140.47226117512 No. of Houses 512th FC9.541.09116598012 No. of Projects 6 BRGF15.064.48 30 0233 No. of Projects

58 MALKANGIRI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA9.051.6018 1.40 Lakh Mandays 2SGSY2.210.4018249600 No. of Swarozgaris 3I.AY ( Normal)8.613.4040418997223 No. of Houses 3aI.AY ( Naxalite) 9.420.941064922664 No. of Houses 4Mo Kudia1.380.423046012026 No. of Houses 512th FC5.040.741560915 No. of Projects 6 BRGF11.952.00 17 021 No. of Projects

59 MAYURBHANJ Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA52.6733.4964 30.18 Lakh Mandays 2SGSY7.373.0041105125715 No. of Swarozgaris 3I.AY (Normal)17.647.614311771193316 No. of Houses 4Mo Kudia2.631.6362118836631 No. of Houses 512th FC15.982.60162087134364 No. of Projects 6 BRGF13.726.98 51 0291 No. of Projects

60 NAWARANGPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA41.3414.9136 7.41 Lakh Mandays 2SGSY4.980.041444600 No. of Swarozgaris 3I.AY (Normal)6.703.2048444380018 No. of Houses 4Mo Kudia1.080.908340617744 No. of Houses 512th FC8.402.533024015665 No. of Projects 6 BRGF12.844.20 33 0120 No. of Projects

61 NUAPADA Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA12.544.6637 1.65 Lakh Mandays 2SGSY2.270.13629321736 No. of Swarozgaris 3I.AY (Normal)4.301.9144174722813 No. of Houses 4Mo Kudia0.670.22331913116 No. of Houses 512th FC6.090.000100 No. of Projects 6 BRGF13.045.02 38 0168 No. of Projects

62 NAYAGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA4.481.59350.001.18 Lakh Mandays 2SGSY2.110.582732761023 No. of Swarozgaris 3I.AY (Normal)9.810.5768242801 No. of Houses 4Mo Kudia2.990.9231900627 No. of Houses 512th FC 10.253.273242137689 No. of Projects 6GGY 9.271.59 17 116 No. of Works

63 KANDHAMAL (PHULBANI) Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA21.325.0124 3.39 Lakh Mandays 2SGSY1.850.26143192471 No. of Swarozgaris 3I.AY (Normal)7.072.373434532086 No. of Houses 4Mo Kudia16.4410.7065537787216 No. of Houses 512th FC7.010.56817232 No. of Projects 6 BRGF14.871.83 12 0174 No. of Projects

64 PURI Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA2.860.89310.000.91 Lakh Mandays 2SGSY2.950.59204720802 No. of Swarozgaris 3I.AY (Normal)14.830.3721062500 No. of Houses 4Mo Kudia4.060.164116100 No. of Houses 512th FC 12.331.65 13 1355138 No. of Projects 6GGY 11.452.35 21 214 No. of Works

65 RAYAGADA Sl. No SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA20.2116.7083 13.82 Lakh Mandays 2SGSY2.430.0833804221 No. of Swarozgaris 3I.AY ( Normal)9.664.9852432493222 No. of Houses 3a.I.AY (Naxalite)7.955.7072670272111 No. of Houses 4Mo Kudia1.621.05654739620 No. of Houses 512th FC9.034.545027322729100 No. of Projects 6 BRGF13.8310.50 76 069 No. of Projects

66 SAMBALPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA16.806.8841 2.83 Lakh Mandays 2SGSY1.530.231525651345 No. of Swarozgaris 3I.AY ( Normal)5.370.821544592866 No. of Houses 3aI.AY ( Naxalite)9.723.023169091652 No. of Houses 4Mo Kudia1.490.37254625712 No. of Houses 512th FC7.120.3551772 No. of Projects 6 BRGF17.907.47 42 0257 No. of Projects

67 SONEPUR Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA10.927.5769 4.63 Lakh Mandays 2SGSY1.510.0962182100 No. of Swarozgaris 3I.AY ( Normal)3.630.4713217227513 No. of Houses 4Mo Kudia0.780.1272373916 No. of Houses 512th FC4.531.1826492857 No. of Projects 6 BRGF10.941.45 13 027 No. of Projects

68 SUNDERGARH Sl. No. SchemesFinancial (Rs.in Crore) Physical TFAExp%TargetAch%Unit 1NREGA11.043.0728 1.38 Lakh Mandays 2SGSY5.100.571152093106 No. of Swarozgaris 3I.AY ( Normal)10.702.212165626009 No. of Houses 4Mo Kudia2.180.994571711316 No. of Houses 512th FC13.874.213038620653 No. of Projects 6BRGF 18.4315.29 83 0277 No. of Projects

69

70 Form L-30 First Page

71 From Second Page Onwards (L30) There will be a row with numbers (1-13) as heading for the 13 scoring criteria. From the 2 nd page of the print out no table headings will be required. Only number heading is enough. Records will be order by Social Group (ST, SC, Oth), Total Score, Name of HOH wise. Back

72 Form L-00 Back

73 Instructions to fill up L-00 forms by Verifying Officers Back

74 Phases TIMELINE MATRIX - VALIDATION OF BPL SURVEY HOUSEHOLD LIST - 2002 08-10-2009 to 22-10- 2009 (15 Days) 23-10- 2009 to 27-10- 2009 (5 Days) 15-11-2009 to 30-11-2009 (16 Days) 01-12-2009 to 15-12- 2009 (15 Days) 04-12-2009 to 31-12- 2009 (28 Days) 01-01-2010 to 15-01- 2010 (15 Days) Printing of Application form Distribu tion of Applicat ion Form Display of L-30 list and Objection Invitation at GP Office Data validation in villages (House-to-house) Data Entry of Validated forms Pallisabha Phase-I Phase-II Phase-III Phase-IV Phase-V Phase-VI 123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263 646465666768697071727374757677787980

75 Form L-60 Back

76

77