1
API 17P TASK GROUP January 15, 2013
2
BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO 13628-15 new recommended practice API 17 P / ISO 13628-15 new recommended practice Effort is being led by API task group Effort is being led by API task group Draft relied heavily on specifications from a number of operators Draft relied heavily on specifications from a number of operators
3
SCOPE production and injection manifolds production and injection manifolds modular and integrated single satellite and multiwell templates modular and integrated single satellite and multiwell templates subsea processing and subsea boosting stations subsea processing and subsea boosting stations flowline riser bases and export riser bases (FRB, ERB) flowline riser bases and export riser bases (FRB, ERB) pipeline end manifolds (PLEM) pipeline end manifolds (PLEM) pipeline end terminations (PLET) pipeline end terminations (PLET) T- and Y-connections T- and Y-connections subsea isolation valve (SSIV) subsea isolation valve (SSIV) subsea controls and distribution structures subsea controls and distribution structures other subsea structures other subsea structures protection structures associated with the above. protection structures associated with the above.
4
TASK GROUP NameCompanyE-mail Charles WhiteBG NorgeCharles.white@bg-group.com Victor VargasFMCvictor.vargas@fmcti.com Jeff WhippleINTEC Engineeringjeffrey.whipple@intec.com Eric BaltmanisExxonMobileric.j.baltmanis@exxonmobil.com Kim DysonINTEC Engineeringkim.dyson@intec.com Chad HughsChevronWHCI@chevron.com Matthew HerroldBPMatthew.Herrold@bp.com Ron PflugerCameronron.pfluger@C-A-M.com Jon Stienar KnutsenStatoil/Hydrojonsk@statoilHydro.com Anders HusbyDnVAnders.Husby@dnv.com
5
TASK GROUP NameCompanyE-mail Eric HevleNexeneric_hevle@nexen.com Marcelo Luiz Ligeiro BarbosaPetrobrasmarceloligeiro@petrobras.com.br Roberto MartinsFMCroberto.martins@fmcti.com Maxwell Brandão de CerqueiraPetrobrasmaxwellbc@petrobras.com.br Frederico NicolettiSubsea 7frederico.nicoletti@subsea7.com
6
CURRENT STATUS Committee Draft version has been competed and passed Committee Draft version has been competed and passed –Completed April 2009 –24 pages of comments Draft International Standard version was sent to technical writer for final formatting Draft International Standard version was sent to technical writer for final formatting Draft International Standard version has been competed and accepted Draft International Standard version has been competed and accepted –Completed March 2010 –26 pages of comments (all have been addressed) –Structural steel section added (updated) Final Draft International Standard version has been competed and submitted for Ballot Final Draft International Standard version has been competed and submitted for Ballot
7
CURRENT STATUS Result of FDIS ballot was approved Q3 2011 Result of FDIS ballot was approved Q3 2011 ISO 13628-15 has been released ISO 13628-15 has been released API adopt back ballot closed November 22, 2011 API adopt back ballot closed November 22, 2011 –15 affirmative votes –2 negative votes (1 operator, 1 hardware supplier) –3 technical comments API recirculation ballot opened August 29, 2012 API recirculation ballot opened August 29, 2012
8
CURRENT STATUS API recirculation ballot closed September 26, 2012 (affirmed) API recirculation ballot closed September 26, 2012 (affirmed) –14 affirmative votes –5 negative votes –Document has been published with editorial comments included New work item needed to start next revision New work item needed to start next revision
9
NEXT STEPS Start next revision Start next revision –Major work in clause 7 (materials) –Reconsider comments from adopt back ballot
10
OPEN ISSUES Need new work item Need new work item