Download presentation
Presentation is loading. Please wait.
Published byBarnaby Russell Modified over 9 years ago
1
SNAP-MAPLANT Integration Effort Strategy Meeting – 2 Mar 2001
2
Vision Statement Production of flight schedules that maximize the ability of maintenance to support command objectives. Production of long-term maintenance schedules that balance planned maintenance and operational needs.
3
Scenario Scene1: easy to support Scene2: ops overstresses maint, maint does best, return failure to ops to drive lesser demands, ops re-runs schedule w/ new A/C up on day X constraints.
4
Outstanding Questions
5
What/if we will do with ordnance Are filling this column in yet? No ordnance for May
6
What other things will T&R codes affect Which T&R codes? relation w/ Pedro’s LUT
7
What portions of FS are important to maintenance? event times/dur, A/C type, [T&R] Are missions prioritized? How do we know which are training and which are frags will add new tag to FS fuel? (a) pri (b) time/dur (c) type [t&r + lut later] (d) pits/turns
8
Must get “pit”, “hot-pit” type stuff precisely defined to model turnaround times. initially no night flights & most preventive maint happens during night shift
9
2p2t2 & resource requirements must be specified
10
We will be shooting for 5- week lookahead? need typical MA scheduled plan
11
{boolean,AAR} responses Previously some talk about “D-5 is going to be down after all” messages. simply the tuple! ops must consider monthly flt hr requirements
12
Planned inspections will come from where? Lt. Martin
13
Aircraft inventory/status will come from where? not current AMRRs, but one w/ only one engine out
14
Personnel roster will come from where? From last MMP?
15
How will we model the health of downed A/C (an attribute-- expected time to repair--of the inventory list)? Also, will we be scheduling these maint actions? (Don’t have manuals) Will DW be providing MAF dumps?
16
Will we consider tools/SE (which)? Goal: model the inventory and resource constraints imposed by this (Martin will help). Borrowing from sister squadron? Tech training ½ day Monday.
17
Will be ignoring TDs? yes, ignore
18
Should be able to start the negotiation iterations from either maintenance or ops? yes Russ Note: Make sure you have the whole squadron modeled @80% capacity.
19
FS schema & String “day|night” problem Pedro will supply alternative datastructure for FS info (includes pits/turns) Pedro will set me up w/ CVS account for source access Getting rid of day birds at Yuma now (16 plane, 400-500hr/mo)
20
Fallback Meet the SNAP IAM Run MAPLAN w/ and w/o FS inputs (but no on-line iteration between maint/ops)
21
Due to the turnover Shooting for Apr 30 th if possible? Open question. ISIS had been shooting for middle of May. Turnover, however is June 1. Make sure you practice the presentation (w/ ISI). Must impress new CO.
22
Integration Run SNAP @ Vandy on Apr 13 th, then run MAPLANT with and without SNAP output. Russ needs to lay down scenario assumptions Need input data from Lt. Martin (get Beatrice involved)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.