Presentation is loading. Please wait.

Presentation is loading. Please wait.

SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads”

Similar presentations


Presentation on theme: "SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads”"— Presentation transcript:

1 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads” SP1 – SAFESPOT In-Vehicle Sensing and Platform Elena Bianco Centro Ricerche FIAT (Italy), elena.bianco@crf.it SAFESPOTSAFESPOT

2 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 2 SAFESPOT – SP1 Administrative issues

3 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 3 SAFESPOT – SP1

4 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 4 SAFESPOT – SP1 Sub-project Effort (18 months plan) SIEMENS

5 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 5 SAFESPOT – SP1 BOSCH All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP1.1284282- 0.7% No needed WP1.317562110+ 20.16% Further development of open source traffic simulator for scenario dependent detection analysis in Java. Detailed scenario definition and use case analysis with the provided traffic simulator. Further improvement of the SAFEPROBE architecture design. Actual version: Guyancourt diagram

6 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 6 SAFESPOT – SP1 CRF All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP1.18380-3.61% No needed WP1.3549555-1.09% No needed

7 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 7 SAFESPOT – SP1 REGIENOV All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP1.319787- 55.84% Synchronisation of the Data Fusion process with the SAFESPOT global architecture. Contribution with JAUS approach for perception and fusion of the data.

8 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 8 SAFESPOT – SP1 VOLVO All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP1.189108+ 21.35% Participated in the SP1 meeting in Pontedera Participated in the Annual review at EC Could you please justify better? WP1.3257265+ 3.11% No needed WP1.472 Started the planning of the work within WP1.4 – Implementation for SP1

9 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 9 SAFESPOT – SP1 PIAGGIO All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP3294322+ 9.52% No needed

10 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 10 SAFESPOT – SP1 IBEO All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP3586800+ 36.51 % The preparation of the cooperative pre-data fusion specification required a lot of discussions between the different subprojects which are still ongoing. Especially, the specification of the V2V/ V2I data required for the cooperative pre- data fusion is still in a critical phase and requires additional harmonization work between the subprojects.

11 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 11 SAFESPOT – SP1 SIEMENS All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP3

12 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 12 SAFESPOT – SP1 ICCS All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP190 0 No needed WP3954920- 3.56 % No needed

13 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 13 SAFESPOT – SP1 MMSE All the data reported in the columns Planned and Actual are taken from the Interim Management Report Q5 – cumulative sheet Justifications are taken from the Interim Activity Report when available PlannedActual Delta (Planned – Actual)/Planned * 100 Justification WP3659688+ 4.4 % No needed

14 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 14 SAFESPOT – SP1 EC review meeting 26-27 March 2007 IP Consensus report See SF-IP_consensus_report_year1_reviw.pdf http://bscw.safespot_eu.org/bscw/bscw.cgi/d81909/SF_IP_con sensus_report_year1_review.pdf

15 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 15 SAFESPOT – SP1 RecommendationCommentResponsibleDue date IPIP.R1Add due date on deliverables Change the deliverable templates, plus check/introduce in all Delivs. Under preparation Amditis + retrofit all deliverable already structured under preparation ASAP IPIP.R2Common architecture with CVIS; COOPERS, …. On Going -- but planning to be respected.See common actions and WG check dates IPIP.R3Requirements satisfaction by specification Necessary to introduce a revised requirement table with a check column Mokaddem30/09/2007 IPIP.R4Synchronization with other projects and back- up Define what we expect from other projects and define back-up solutions All - to Brignolo for synthesis 30/06/2007 IPIP.R5Commitment of non- partners providing contribution to the projects generate a risk analysis procedure extended also to other risks Andreoneby next CG meeting IPIP.R6Other communication solutions Prepare the answer, but generally SAFESPOT relay on other systems ( e.g. CVIS) when other links are needed Brignoloby next CG meeting

16 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 16 SAFESPOT – SP1 RecommendationCommentResponsibleDue date IPIP.R7Sensors analysisProvide cost-benefit analysis (CBA) of the adopted solutions. The information will be useful also for the global CBA in SP6 Spence30/06/2007 IPIP.R8Planning inconsistencies detection For each SP Split activities and provide a detailed planning up to the prototypes delivery. Needs from other SPs or external devices must be highlighted all SP leaders10/07/2007 draft ASAP IPIP.R9Dissemination activities monitoring Provide a tool for this monitoringAmditis30/06/2007 IPIP.R10Business aspects,….Provide support to SP6. Han Zwjinenberg will provide a request table to all SPs and a reference will be appointed in each Sps for each topic. ZwjinenbergASAP IPIP.R11Scientific dissemination, address IEEE conferences Diffuse the request to partnersSP leadersASAP IPIP.R12Detailed test site planningContact TS leaders and organize a global kick-off of test sites in first half of September Brignolo06/06/2007 IPIP.R13Physical part demonstration From planning analysis provide proposal for next review demonstration SP1 to SP5 leaders10/07/2007

17 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 17 SAFESPOT – SP1 RecommendationCommentResponsibleDue date SP1SP1.R1Ensure interoperability vs. other SPs Detailed interface description, already plannedZottContinuous SP1SP1.R2Highlight innovation aspects in next deliverables Introduce a specific note in each deliverable ( update the template accordingly -- Amditis) Zott, All SP-Leaders, Amditis before Deliverables submission SP1SP1.R3Describe clearly the process from requirement to architecture To be described in SP7 but also in single deliverables? Mokaddem, all SP leaders24/07/2007 SP1SP1.R4Focus on relevant scenarios SP1 is already working in that directionZottContinuous

18 SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 18 SAFESPOT – SP1 D1.2.1 Vehicle probe use case and test scenarios accepted - somewhat weak D1.2.2 System Analysis Not accepted Irmgard Heiber proposed to send her a letter with comments and proposed actions to the specific points / comments made by the reviewers.


Download ppt "SF- SP1 – Plenary Meeting June 14 th and 15 th 2007 - Santorini 1 Integrated Project Co-operative Systems for Road Safety “Smart Vehicles on Smart Roads”"

Similar presentations


Ads by Google