CSV Issues B. Vila-Vilaro (NAOJ) ASAC F2F, Florence, Sept 2006
2
CSV Teams Since ACA System PDR (Nov 2005) “ joint ” activity Staffing: “ Core ” members + Additional -Requirements ( “ boxes ” approach) -Negotiations with ASIAA (Taiwan) -EA ARC Contribution On-site vs. Remote Support Issues ATF and AIV involvement (How many and when) “ Similar ” tests/Knowledge base Sharing Resources
3
Additional (pre)CSV Sites MELCO Antenna Construction Facility (Kurashiki,Okayama Pref.) Oct-Dec 2006: CIPT + Metrology + Pointing ACA Correlator Test Facility (NAOJ, Mitaka) Sept-Oct 2006, Dec 2006-Jan 2007,May 2007- Sept-2008 SMA @ Mauna Kea Observatory (Hawaii, USA) ASTE Tests
4
ACA Corr Band4 Band8 Band10 ACA CSV Timeline Both 12m handed over at same time MELCO Refurbished 12m Antenna First 7m Antenna
5
Strawman CSV Model OSF AOS 12M 2(?) 7M 2(?) First 7M ACA BALMA ACA BALMA Ant Ant Site Site Similar Antennas Similar Tests Sharing Resources and Experience Joint Array TP+Interf Combined Modes Additional Bands Other Obs. Modes
6
12m and 7m ant: Main Diff. 12m Ant7m Ant Size12m7m Surf Acc 25 m20 m Opticsf/D~0.4f/D~0.367 Central Hole SubrefNutator+ConeSubref+Cone WVRONNone (intially?) Obs ModesTP(all)+InterfTP(some)+Intf Holography Beam Patt
7
ACA Specific Issues TP Observations + Nutator WVR Phase Correction (4-point method) ACA Correlator Issues Configuration Evolution until Full Operation Calibration (Cross-calibration, high accuracy modes, etc) CSV STAGES for ACA 1 TP 12m antenna (Milestone, not at ACA Site) 1TP + ACA Correlator 2TP + ACA Correlator 4 TP + 1 st 7m Growth of 7m Array