Download presentation
Presentation is loading. Please wait.
Published byRoland Bridges Modified over 9 years ago
1
Rucio Commissioning ADC Operations
2
Rucio Commissioning Won’t go into the details of the commissioning ToDo list and priorities didn’t change respect to 6 weeks ago https://indico.cern.ch/event/276501/session/1/contribution/3/material /slides/1.pdf https://indico.cern.ch/event/276501/session/1/contribution/3/material /slides/1.pdf https://indico.cern.ch/event/276501/session/17/contribution/58/mater ial/slides/1.pdf https://indico.cern.ch/event/276501/session/17/contribution/58/mater ial/slides/1.pdf But a lot of work has been done in the meanwhile! 28 October 2014 ADC Ops 2
3
.. 28 October 2014 ADC Ops 3
4
.. 28 October 2014 ADC Ops 4
5
ProdSys2 task with input/output in Rucio Full chain is ongoing Not all task finished (evgen and simul OK) not a real issue, more an error while defining the chain. Still assigned manually Not spot up to now real issues related to Rucio 28 October 2014 ADC Ops 5
6
Horizontal scalability Present situation: possible to scale horizontally with “fixed” configuration Judge: rucio-daemon-prod-01, singleprocess, multithread Conveyor: rucio-daemon-prod-02,06,07,08, multiprocess, multithread Hermes: rucio-daemon-prod-02, singleprocess, singlethread Undertaker: rucio-daemon-prod-03, singleprocess, multithread Kronos: rucio-daemon-prod-03, singleprocess, singlethread Automatix: rucio-daemon-prod-04, singleprocess, multithread Transmogrifier: rucio-daemon-prod-04, singleprocess, singlethread Necromancer: rucio-daemon-prod-04, singleprocess, singlethread Reaper: rucio-daemon-prod-05, multiprocess, multithread Trying to increase the available VMs now “Automatic” scalability: The database change for automatic configuration of scalability of daemons is in production. The patch to support this is implemented, not in production yet. 28 October 2014 ADC Ops 6
7
Rucio Tape management: stagein Blocker issues resolved Retries with timestamp Bringonline parameters passed to FTS3 Sorting out now details of RSEs for tapes One RSE for “staging area” Mostly internal, between judge and conveyor 28 October 2014 ADC Ops 7
8
Rucio *now* 28 October 2014 ADC Ops 8 ongoing Ongoing: spot inconsistencies, under fixing done tested
9
28 October 2014 ADC Ops 9 Still to be done Ongoing done To be validated Recovery done, monitoring ongoing ongoing Still to be done Ongoing See rucio-ui Patched, not deployed Rucio “others” ongoing
10
DQ2 – Rucio migration 28 October 2014 ADC Ops 10
11
Backup Horizontal scalability from Vincent 28 October 2014 ADC Ops 11
12
.. .. .. . 28 October 2014 ADC Ops 12