1 Rucio Commissioning ADC Operations

2 Rucio Commissioning  Won’t go into the details of the commissioning ToDo list and priorities didn’t change respect to 6 weeks ago  https://indico.cern.ch/event/276501/session/1/contribution/3/material /slides/1.pdf https://indico.cern.ch/event/276501/session/1/contribution/3/material /slides/1.pdf  https://indico.cern.ch/event/276501/session/17/contribution/58/mater ial/slides/1.pdf https://indico.cern.ch/event/276501/session/17/contribution/58/mater ial/slides/1.pdf But a lot of work has been done in the meanwhile! 28 October 2014 ADC Ops 2

3 .. 28 October 2014 ADC Ops 3

4 .. 28 October 2014 ADC Ops 4

5 ProdSys2 task with input/output in Rucio  Full chain is ongoing Not all task finished (evgen and simul OK)  not a real issue, more an error while defining the chain. Still assigned manually  Not spot up to now real issues related to Rucio 28 October 2014 ADC Ops 5

6 Horizontal scalability  Present situation: possible to scale horizontally with “fixed” configuration  Judge: rucio-daemon-prod-01, singleprocess, multithread  Conveyor: rucio-daemon-prod-02,06,07,08, multiprocess, multithread  Hermes: rucio-daemon-prod-02, singleprocess, singlethread  Undertaker: rucio-daemon-prod-03, singleprocess, multithread  Kronos: rucio-daemon-prod-03, singleprocess, singlethread  Automatix: rucio-daemon-prod-04, singleprocess, multithread  Transmogrifier: rucio-daemon-prod-04, singleprocess, singlethread  Necromancer: rucio-daemon-prod-04, singleprocess, singlethread  Reaper: rucio-daemon-prod-05, multiprocess, multithread Trying to increase the available VMs now  “Automatic” scalability: The database change for automatic configuration of scalability of daemons is in production. The patch to support this is implemented, not in production yet. 28 October 2014 ADC Ops 6

7 Rucio Tape management: stagein  Blocker issues resolved Retries with timestamp Bringonline parameters passed to FTS3  Sorting out now details of RSEs for tapes One RSE for “staging area” Mostly internal, between judge and conveyor 28 October 2014 ADC Ops 7

8 Rucio *now* 28 October 2014 ADC Ops 8 ongoing Ongoing: spot inconsistencies, under fixing done tested

9 28 October 2014 ADC Ops 9 Still to be done Ongoing done To be validated Recovery done, monitoring ongoing ongoing Still to be done Ongoing See rucio-ui Patched, not deployed Rucio “others” ongoing

10 DQ2 – Rucio migration 28 October 2014 ADC Ops 10

11 Backup Horizontal scalability from Vincent 28 October 2014 ADC Ops 11

12 .. .. .. . 28 October 2014 ADC Ops 12