RedStone Highlights For Website 7/20/2015
2
RedStone Highlights Drag Conveyor drive sprocket Usually have to change out the sprocket & chain every 6 months. $15K expense. Customer believes they will get 2 years out of it now. Traverse Conveyor
3
Batched Gates
4
RedStone Key Points: 64 bearings & 2 Chains 140 feet up Hard to reach bearings are now being greased properly Safety System never takes a day off Proper amount of grease overtime
5
RedStone Pump & Controller Giving each bearing the right amount of grease overtime Grease drum will last months
6
RedStone Silo #2 Clean system layout Injectors can be adjusted Injectors show a lube event has taken place
7
RedStone Grease ring is perfect. Bearing is protected from outside elements System can easily move with machine