Presentation is loading. Please wait.

Presentation is loading. Please wait.

SG 27/1/2014. Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and.

Similar presentations


Presentation on theme: "SG 27/1/2014. Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and."— Presentation transcript:

1 SG 27/1/2014

2 Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and prep. for run 2 NSW DAQ workshop and IB

3 ATLAS week Need to find a speaker for the muon system – Proposal: Giulio Aielli or Ed Moise – others???

4 OTP OTP tables almost filled still missing: – CSC – DAQ – Calibration – Toroid field map calculation There are some of the activities that are not really reasonable: – MDT requirement = 8 all filled (with many people that have not been in this activity since long time) – DQA requirement = 6 almost all filled (and we know that there is no people working on it) I think that we should try to revise this activities within this week.

5 Qualification tasks Each activity should keep up to date the list of qualification tasks – https://twiki.cern.ch/twiki/bin/viewauth/Atlas/Qu alificationList https://twiki.cern.ch/twiki/bin/viewauth/Atlas/Qu alificationList This is one of the ONLY way to get new people in the game.

6 2013 financial BOOK CLOSING PAYMENTS 2013 Muon T577100 565.2 MDT T577110 4.2 RPC T577130 19.4 TGC T577140 16.3 605.2 In-Kind - Other - OPEN COMMITMENTS 31.7 CET Income 2013 639.0 Past - Future 16.0 Other - 655.0 less 2013 income received 2012 MPI 17.0 Chile 2.0 (19.0) 636.0 less Payments 2013 605.2 Other - (605.2) 30.9 plus Carry over from 2012 118.5 Carry Over to 2014 149.4 Payments breakdown Various orders 123.5 Epool rental 20.2 Workshop 1.7 Stores 17.3 Subsistence 292 GSM 5.3 TIDs 180.8 Transport 2.3 605.2 Total budget for 2014 was 650 KCHF Spent 605 Open commitments 32


Download ppt "SG 27/1/2014. Muon week format MondayTuesdayWednesdayThursdayFriday MorningSoftware Smaller upgrades / Pashe 2 PerformanceNSWPlenary Afternoon LS1 and."

Similar presentations


Ads by Google