Download presentation
Presentation is loading. Please wait.
Published byAmie Matthews Modified over 9 years ago
1
ERP Status Overview Steve Gigliotti Chief, Division of Safety Coal Mine Safety & Health
2
Overview Number of approved ERPs Number of installed systems
5
C&T Inspection Procedures PIL being drafted Compliance with ERPCompliance with ERP PPL P09-V-01PPL P09-V-01 Qs & AsQs & As System components Part 23 approvedSystem components Part 23 approved Verify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surfaceVerify C&T system is operational by randomly communicating during inspection and comparing route of travel with electronic records on the surface
6
C&T Inspection Procedures Responsible person on surface to monitor location of miners underground (75.1600-1)Responsible person on surface to monitor location of miners underground (75.1600-1) Two way communication inside RA (75.1600-3)Two way communication inside RA (75.1600-3) Identifying number on miner’s brass tag worn on belt matches identifying number in system (75.1715)Identifying number on miner’s brass tag worn on belt matches identifying number in system (75.1715) Minimum safe distance to prevent interference with blasting circuits (75.1323(a))Minimum safe distance to prevent interference with blasting circuits (75.1323(a)) C&T systems shall remain operational during fan stoppages or a mine power outage (75.313) C&T systems shall remain operational during fan stoppages or a mine power outage (75.313)
7
Overview - Consolidate Q&A documents for next round of ERPs
8
QUESTIONS?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.