Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003
2
Introduction Ion pump power supplies (IPPS) are located in booster gallery Supply power to 600 L/s ion pumps located in booster ring Old IPPS were inaccurate and poorly efficient Modified IPPS are more productive and accurate The modification of the IPPS will pave the way for greater vacuum, thus better quality beam
3
Ion Pumps About 80 pumps located around booster beam Absorb ions in vacuum tube Pump contains plates Supplied voltage charges plates Ions are attracted to charged plates, and stick onto the plates With less ions and a better vacuum, beam is of better quality
4
Ion Pumps cont’d Ultek 600L/s Ion pump Operation life is 40,000 hours at 10E-6 torr
5
IPPS IPPS are located around booster gallery One IPPS controls one ion pump Delivers voltage to the ion pump Inside IPPS are capacitors, resistors, diodes, transformers, wires, etc. Project focuses on modification of Perkin- Elmer 222-0800 IPPS
6
IPPS cont’d IPPS are placed in relay racks around booster gallery. The blue label indicates where in booster ring the ion pump is located.
7
Problem IPPS are over 30 years old Inaccurate read-backs Poor efficiency
8
Solution Investigate read-back inaccuracies Analyze different methods for increased efficiencies Updating out-dated components Developing the daughter card Filter noise
9
Daughter Card Contains resistors, capacitors, diodes, and gates Squared off section in schematic 3 main elements Top circuit – converts current to voltage Middle circuit – powers card Bottom circuit – controls IPPS
10
Daughter Card cont’d
11
Testing Cards Extender card for safety Adjust R30 to 6.1V Establish a reference level Verify components measure accurately Run timing tests
12
Modifying Obtain old power supplies There are 55 Perkin-Elmer 222-0800 IPPS Most components are removed as well as wires IPPS circuitry remains similar to old
13
Front panel Before After
14
Left Side Panel Before After
15
Right Side Panel BeforeAfter
16
Back Panel Before After
17
Back Panel cont’d BeforeAfter
18
Testing Calibration of torr meter 10/20 min run tests 8 hour simulation test
19
Testing cont’d Load resistance testing I IPPSair load Ion pump
20
Conclusions Upgrade IPPS will lead to better control of vacuum Setbacks Delay in schedule Troubleshooting Knowledge of electrical circuits Technical skills Soldering Drilling