* PROJECT OVERVIEW. 1. WHAT? 2. WHERE?
3
* Objective and Method of construction 1. WHAT IS THE OBJECTIVE ? 2. WHICH METHOD USE ?
4
*Work breakdown structure : Definition?
5
Activity list : 1. What is activity mean ? 2. What is the relationship between activity ?
6
Sample of calculation 1. Concrete volume calculation. 2. Steel weight calculation. 3. Cost calculation.
7
Resource and network preparation 1.Resources : For this project resources we should depended on local resources and most availability in order to make less cost and decrease the risk. 2.Network preparation :
8
Result : 1.determine the quantity 2. duration 3.dependency between activities
9
Risk case : 1.Political situation. the closures and curfews as a results of the occupation. 2.Exchange rate. ** The risk can’t stopped it but we can avoid and reduce. the risk for this project is classified known.