Download presentation
Presentation is loading. Please wait.
Published bySandra Bond Modified over 9 years ago
1
INC Report to the NANC – March 15, 2005 1 Industry Numbering Committee (INC) Report to the NANC March 15, 2005 Ken Havens - INC Chair Adam Newman - INC Vice Chair
2
INC Report to the NANC – March 15, 2005 2 INC Meetings Last INC Meeting: February 1-3, 2005, Maitland, FL Next INC Meeting: April 5-7, 2005, Atlanta, GA Details on all future meetings can be found at: www.atis.org/inc/calendar.asp www.atis.org/inc/calendar.asp
3
INC Report to the NANC – March 15, 2005 3 CO/NXX Subcommittee Issue 453: Forecast Improvements Centralizes forecast submissions by SPs through NANPA by adding six-month forecasting data to FCC Form 502, thereby eliminating Thousands-Block Pool Forecast Report (Appendix 1). Suggests development of mechanized interface between NANPA and PA to permit PA to continue to manage/forecast the industry pool on a 6-month basis. This issue will impact FCC Form 502, and the NAS and PAS number administration systems. INC is working this issue and will inform the NANC of its progress.
4
INC Report to the NANC – March 15, 2005 4 CO/NXX Subcommittee Issue 466: Update COCAG Appendix C for Code Holder Changes in NPAC INC opened this issue in response to a request from the LNPA Working Group. This issue addressed the request to modify the COCAG Appendix C to include the Coordinated Industry Effort Process as an option for SPs to change the Code Holder of an NXX in the NPAC. INC was contacted by the LNPA Working Group with suggested changes to the COCAG; issue is still being worked.
5
INC Report to the NANC – March 15, 2005 5 NPA Subcommittee US Dept. of Navy Request for NPA INC received, organized and prioritized feedback from industry forums/committees with nearly 100 questions in response to its request for input. INC scheduled a cross-committee meeting to allow DoN to address the questions of the committees in an expedited fashion. DoN asked INC to table the issue on March 3, 2005. DoN will use the next 90 days to conduct further analysis and review, and to try to satisfactorily resolve questions concerning a Navy area code concept.
6
INC Report to the NANC – March 15, 2005 6 Issues Remaining in Initial Pending Due to Change Order Process Issue 458: Reduce “ Aging Period ” for Returned/Reclaimed Blocks
7
INC Report to the NANC – March 15, 2005 7 Issues in Final Closure Issue 464: Update Pool Indicator Footnote on CO Code Part 1 Form Issue 434: Removal of Codes from NPAC When There Are Ported Numbers
8
INC Report to the NANC – March 15, 2005 8 Relevant INC Web Pages INC Homepage (front page to all INC links): http://www.atis.org/inc/index.asp http://www.atis.org/inc/index.asp INC Calendar (future meeting logistics/agendas): http://www.atis.org/inc/calendar.asp http://www.atis.org/inc/calendar.asp INC Issues (historical and active): http://www.atis.org/inc/incissue.asp http://www.atis.org/inc/incissue.asp INC Meeting Records: http://www.atis.org/inc/mtgs2005.asp http://www.atis.org/inc/mtgs2005.asp INC Published Documents: http://www.atis.org/inc/docs.asp http://www.atis.org/inc/docs.asp
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.