Download presentation
Presentation is loading. Please wait.
Published byJeffrey Hicks Modified over 9 years ago
1
Welcome To The 5 th Annual All Hands Meeting
2
FAIRY WOLF DUCKLING
4
GOOD
8
Approval to design and build a central chilled water plant
9
Increased level of deferred maintenance dollars
10
Replacing a large percentage of old steam lines
11
Approval to renovate and add on to 438 College Street
12
Implementation At UVM
13
Completion of Admissions Visitor Center
14
Boiler Plant Controls Upgrades
15
Completion of the Education Center at The College of Medicine Began Construction of 800 Bed Residential Learning Complex
16
Construction of parking garage Construction of Artificial Turf Field
17
Hired 30 + New Employees
19
Approval for new fire protection system for Rowell and Given ($3 Million)
20
Water-proofed many foundations
21
Approval to go ahead with Dudley Davis Student Commons
23
BAD
25
Still Too Many Freeze Ups
28
Ira Allen Exterior Problems
29
BAD
30
UGLY
32
Build on the Good Minimize the Bad Avoid (at all costs) the Ugly Boils Down To This
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.